Highway 16 |
Highway 16 (Yellowhead Highway). Road maintenance work planned between Perry Rd and Palling Rd E for 1.9 km (Palling). Starting Mon Jul 28 until Fri Aug 1. From 7:00 AM to 7:00 PM PDT on weekdays. Expect delays. Single lane alternating traffic will be in effect. Last updated Wed Jul 23 at 6:39 PM PDT. (DBC-79553) |
Highway 37 Both Directions |
Highway 37, in both directions. Bridge construction at Hanna North Bridge (7 km north of Meziadin). Until Fri Oct 31. Single lane alternating traffic. Width limit 4.00 m. EOL approvals up to 85 tonnes with no centre line crossing restriction. Expect minor delays. Next update time Thu Jul 31 at 8:00 AM PDT. Last updated Fri Jun 6 at 1:06 PM PDT. (DBC-76204) |
Highway 37 Both Directions |
Highway 37, in both directions. Bridge maintenance between Bell 1 Bridge and Deltaic Cr Bridge for 32.4 km (32 km north of Meziadin to 26 km south of Bell II). From 7:00 AM to 7:00 PM PDT on weekends and Monday. Single lane alternating traffic. Watch for crews and equipment. Next update time Mon Jul 28 at 12:00 PM PDT. Last updated Mon Jul 21 at 11:53 AM PDT. (DBC-78617) |
Highway 37 |
Highway 37. Crack sealing is underway between Dease River Bridge and Cottonwood Rest Area South (46 km south of Jade City). Until Mon Aug 4. From 7:00 AM to 7:00 PM PDT daily. Expect delays up to 30 minutes. Pilot Car controlled. Last updated Wed Jul 23 at 11:03 AM PDT. (DBC-78755) |
Highway 37 Both Directions |
Highway 37, in both directions. Roadside brushing between Blue River Bridge and Border Rest Area for 28.7 km (29 km south of British Columbia and Yukon Border to British Columbia and Yukon Border). Until Fri Jul 25. From 7:00 AM to 5:00 PM PDT on weekdays. Possible delays. Last updated Wed Jul 23 at 11:04 AM PDT. (DBC-79392) |
Highway 37A Both Directions |
Highway 37A, in both directions. Paving operations between Bitter Cr. Bridge and Windy Point Bridge for 29.4 km (11 km east of Stewart to 18 km west of Meziadin). Until Sat Sep 13. Single lane alternating traffic. Expect delays up to 30 minutes. Pilot Car controlled. Last updated Wed Jul 2 at 3:48 PM PDT. (DBC-78756) |
Highway 37A Both Directions |
Highway 37A, in both directions. Road sweeping between American Pullout and Highway 37 Junction for 38.9 km (20 km east of Stewart to Meziadin). From 8:00 AM to 4:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Watch for traffic control. Watch for oncoming traffic and yield to oncoming traffic, pass with care. Last updated Tue Jul 22 at 12:07 PM PDT. (DBC-79247) |
Highway 37A Both Directions |
Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). Last updated Wed Jul 23 at 4:35 PM PDT. (DBC-74957) |
Other Roads Both Directions |
Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Expect delays. Partial road washout, obey signage. Next update time Fri Aug 29 at 10:00 AM PDT. Last updated Fri Jul 18 at 10:06 AM PDT. (DBC-71008) |