Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Savory Pit Rd and SA24/23 Maintenance Boundary for 14.1 km (6 km west of Endako to Priestly Hill). Until Tue Oct 7. From 8:00 AM to 4:00 PM PDT daily. Shoulder closed. Last updated Thu Sep 11 at 3:37 PM PDT. (DBC-81473) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Paving operations between Fraser Mountain Rd and Engen Townsite Rd for 22.7 km (3 km west of Fort Fraser to 14 km west of Vanderhoof). Until Sun Sep 28. From 7:00 AM to 7:00 PM PDT daily. Shoulder maintenance and milling planned. Watch for traffic control personnel. Expect delays. Last updated Fri Jul 18 at 4:55 PM PDT. (DBC-79459) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road maintenance work between Horsey Creek Rd and Small Creek Bridge for 4.7 km (15 to 20 km west of Tete Jaune). Until Thu Oct 30 at 6:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Maximum overall width is 5m. Loads over 5m must contact rbuckham@outlook.Com with a minimum of 48-hours to see if they can be accommodated. Last updated Wed Aug 27 at 10:07 PM PDT. (DBC-79051) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work between Avola East Frontage Rd S Access and Diamond Dr for 1.1 km (Avola). Single lane alternating traffic. Poleline maintenance. Telecom cable installation. Last updated Wed Sep 10 at 9:20 AM PDT. (DBC-81405) |
Highway 5 Northbound |
Highway 5, northbound. Ditching between Albreda Pit Rd and Camp Creek Rest Area for 14.3 km (23 to 9 km south of Valemount). Southbound lane closure. Watch for traffic control. Truck speed limit 70 km/h. Ditching work, North Bound lane reduced to 70 kilometers per hour. Next update time Tue Sep 30 at 8:30 AM PDT. Last updated Mon Jul 21 at 5:47 PM PDT. (DBC-79542) |
Highway 5 Both Directions |
Highway 5, in both directions. Road construction work between Whiskeyfill Rd and Tete Jaune Access Rd for 24.1 km (5 km south of Valemount to 1 km south of Tete Jaune). Until Mon Oct 20. From 12:00 AM to 12:00 AM PDT daily. Paving operations. Single lane alternating traffic. Pilot car controlled. Last updated Tue Sep 2 at 7:50 AM PDT. (DBC-81092) |
Highway 5 Northbound |
Highway 5, northbound. Paving operations between Cedarside Rd; Cranberry Lake Rd and Tete Jaune Access Rd for 22.3 km (2 km south of Valemount to 1 km south of Tete Jaune). Until Sat Sep 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Roadside barriers removed. Watch for crews on highway. Last updated Sun Jul 13 at 8:26 PM PDT. (DBC-79166) |
Highway 5 Both Directions |
Highway 5, in both directions. Traffic signal outage planned between Walterdale Rd and Blackman Rd for 283.6 km (8 km north of Valemount to 15 km south of Barriere). Starting Sun Sep 14 at 7:00 AM PDT until Sun Sep 14 at 7:00 PM PDT. Utility work planned. BC Hydro planned power outage. No fuel or EV charging McLure to Valemount. Last updated Mon Sep 8 at 11:46 AM PDT. (DBC-81312) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Tue Sep 30 at 10:00 AM PDT. Last updated Mon Jun 30 at 10:04 AM PDT. (DBC-71474) |
Highway 97 |
Highway 97. Utility work planned between Noranda Rd and Collins Rd for 0.6 km (Prince George). Starting Wed Sep 17 at 6:00 AM PDT until Sat Sep 20 at 6:00 PM PDT. Right lane will be closed. Last updated Tue Aug 5 at 8:12 AM PDT. (DBC-80093) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426) |