• Events for Highway 15
  • Highway 15 Southbound [Truncated] Highway 15 (Pacific Highway), southbound. Paving operations planned at 88 Ave (Surrey). Starting Fri Jul 25 at 6:00 PM PDT until Mon Jul 28 at 5:00 AM PDT. Left turn lane will be closed. Right turn lane will be closed. Watch for traffic control personnel. Full 24 hours closure of 88th Avenue between Highway 15 and 168th street. Left and right turn lanes from Highway 15 onto 88th Avenue will be closed. Next update time Mon Jul 28 at 5:00 AM PDT. Last updated Wed Jul 23 at 12:02 PM PDT
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Utility work between 20 Ave and 26 Ave for 1.2 km (Surrey). Until Thu Jul 31. From 9:00 PM to 5:00 AM PDT daily. Watch for traffic control. Intermittent lane closures. Last updated Fri Jul 18 at 10:12 AM PDT. (DBC-79104)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Utility work planned between 26 Ave and 28B Ave (Surrey). Starting Fri Jul 25 at 8:00 AM PDT until Fri Jul 25 at 4:00 PM PDT. Right lane will be blocked. Pole access and cable crossing. Last updated Wed Jul 23 at 2:10 PM PDT. (DBC-79646)
    Highway 15 Southbound Highway 15 (Pacific Highway), southbound. Road maintenance work between 64 Ave and 60 Ave for 0.7 km (Surrey). Until Sat Jul 26. From 11:00 AM to 2:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Removal and replacement of sound fence 64 Ave to 61A Ave. Last updated Mon Jul 7 at 12:26 PM PDT. (DBC-77776)
    Highway 15 Both Directions Highway 15 (Pacific Highway), in both directions. Maintenance between Highway 10 and 68A Ave for 2.7 km (Surrey). Until Sat Aug 9. From 7:30 AM to 1:30 PM PDT on Saturday. Left lane is closed. Work will take place on Jul 26th and Aug 9th. Alternating closures in both directions. Watch for traffic control. Last updated Mon Jul 21 at 10:35 AM PDT. (DBC-79408)