Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Roadside brushing between 4 Ave and 32 Ave for 5.6 km (Surrey). Until Fri Apr 25 at 3:00 PM PDT. Right lane is blocked. Shoulder closed. Powerline maintenance for BC Hydro. Last updated Thu Apr 10 at 3:19 PM PDT. (DBC-75230) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work planned between 20 Ave and 24 Ave for 0.8 km (Surrey). Starting Tue Apr 22 until Fri Apr 25. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed. Last updated Thu Apr 17 at 1:10 PM PDT. (DBC-75524) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work between 32 Ave and 40 Ave for 1.6 km (Surrey). Until Mon May 12. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Thu Mar 13 at 3:24 PM PDT. (DBC-73932) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 14 at 11:23 AM PDT. (DBC-75355) |