Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Sep 30 at 12:00 PM PDT. Last updated Mon Jul 21 at 12:13 PM PDT. (DBC-54341) |
Highway 17 Both Directions |
Highway 17, in both directions. Paving operations between 136 St and 104 Ave for 8.7 km (Surrey). Until Thu Jul 24 at 5:00 AM PDT. Lane closures in both directions in effect. Expect delays. Watch for traffic control. Crossover traffic in effect for paving operations between The Fraser heights bridge and 104th ave. Eastbound lanes closed. One lane open in both directions in the Westbound lanes. Next update time Thu Jul 24 at 5:00 AM PDT. Last updated Wed Jul 23 at 2:48 PM PDT. (DBC-79538) |
Highway 17 Southbound |
Highway 17 (Patricia Bay Highway), southbound. Utility work planned between Gliddon Rd and Haliburton Rd for 4.8 km (Central Saanich to Saanich). Starting Thu Jul 24 at 10:00 PM PDT until Fri Jul 25 at 6:00 AM PDT. Crews will be flushing hydrants with a rolling right shoulder closure. Possible intermittent lane closures as required. Last updated Thu May 22 at 11:12 AM PDT. (DBC-76953) |
Highway 17 Northbound |
Highway 17 (Patricia Bay Highway), northbound. Paving operations between Exit 26: McTavish Rd and Exit 31 for 5.4 km (North Saanich). Until Fri Aug 22. From 7:30 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Expect delays. Last updated Tue Jul 15 at 4:30 PM PDT. (DBC-79282) |