Highway 19A Northbound |
Highway 19A (Island Highway), northbound. Electrical maintenance planned at Norwell Dr (Nanaimo). Starting Thu Jan 2, 2025 at 8:30 AM PST until Thu Jan 2, 2025 at 2:30 PM PST. Right lane will be closed. Watch for traffic control personnel. Speed reduction will be in place. Last updated Mon Dec 16 at 8:41 AM PST. (DBC-71173) |
Highway 19A |
Highway 19A (Island Highway). High winds between Exit 46 and Cook Creek Rd for 43.8 km (Parksville to 12 km south of Buckley Bay Ferry Terminal). Water pooling. Last updated Sat Dec 28 at 5:58 AM PST. (DBCRCON-206263) |
Highway 19A |
Highway 19A (Island Highway). Water pooling between Jamieson Rd and Glenmore Rd for 58.5 km (12 km south of Buckley Bay Ferry Terminal to 11 km south of Campbell River). Heavy rain. Last updated Sat Dec 28 at 7:10 AM PST. (DBCRCON-206913) |
Highway 19A |
Highway 19A (Island Highway). Water pooling between Catherwood Rd and the end of Highway 19A (Island Highway) for 23.7 km (Campbell River). Last updated Sat Dec 28 at 7:09 AM PST. (DBCRCON-206910) |