Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Marview Dr and Lambert Lane for 0.6 km (17 to 16 km north of Qualicum Beach). Starting Thu Aug 7 at 9:00 AM PDT until Thu Aug 7 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. BC Hydro pole replacement - watch for speed reduction and work crews. Last updated Mon Jul 21 at 11:52 AM PDT. (DBC-79371) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Terrain Rd and Fosgate Rd for 1.2 km (11 to 10 km south of Campbell River). Starting Mon Jul 28 at 9:00 AM PDT until Fri Aug 1 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Aerial Splicing on Existing poles. Last updated Wed Jul 23 at 11:24 AM PDT. (DBC-79638) |
Highway 19A |
Highway 19A (Island Highway). Construction work between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |