Highway 3 (Crowsnest Highway), in both directions. Construction work between Exit 177 and First Avalanche Gate for 4.7 km (3 to 8 km east of Hope). Until Thu Oct 31 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on weekdays and Saturday. Blasting. Expect delays. Last updated Tue Sep 3 at 6:47 AM PDT. (DBC-67647) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned between Sunshine Valley and Manning Park Resort for 46.2 km (17 to 64 km east of Hope). Starting Wed Oct 2 at 6:00 AM PDT until Fri Oct 4 at 7:00 PM PDT. Watch for trucks turning. Last updated Thu Sep 26 at 3:18 PM PDT. (DBC-67263) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Allison Pass Summit and Manning Park Resort for 7.4 km (56 to 64 km east of Hope). Until Mon Sep 30. From 6:00 AM to 7:00 PM PDT daily. Watch for traffic control. Last updated Fri Aug 16 at 4:22 PM PDT. (DBC-67277) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations planned between Allison Pass Summit and Owl Way for 9.3 km (64 to 54 km east of Hope). Starting Wed Oct 2 until Fri Oct 4. From 7:00 AM to 7:00 PM PDT on weekdays. Lane closures in both directions planned. Paving and Spillways repair. Last updated Thu Sep 26 at 10:44 AM PDT. (DBC-68465) |
Highway 3 |
Highway 3 (Crowsnest Highway). Limited visibility between Thimble Mtn Trailhead and Spencer St (9 km west of Grand Forks). Forest fire. Last updated Wed Sep 25 at 3:32 PM PDT. (DBC-68612) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Rock slope stabilization planned between 68th Ave and East Lake Dr (Christina Lake). Starting Tue Oct 1 until Sat Nov 2. From 7:30 AM to 5:30 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Last updated Wed Sep 25 at 12:28 PM PDT. (DBC-68602) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Jim Smith Lake Rd and Ft. Steele Overhead Bridge for 5.8 km (Cranbrook). Until Sun Sep 29. Lane Closure. Watch for traffic control. Expect delays. Single lane traffic with 10 minute delay. Last updated Thu Aug 15 at 1:59 PM MDT. (DBC-67226) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Thu Oct 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Mon Aug 12 at 9:47 AM MDT. (DBC-60199) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Corbin Rd and BC/AB Border for 5.6 km (6 km east of Sparwood to 1 km west of Crowsnest Pass Summit). Until Thu Oct 31. From 6:00 AM to 6:00 PM MDT daily. Shoulder closed. Wildlife fencing between Corbin Rd and the Sparwood CVSE Station. Last updated Fri Sep 27 at 5:26 AM MDT. (DBC-68675) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work planned between BC/AB Border and Corbin Rd for 5.6 km (1 km west of Crowsnest Pass Summit to 6 km east of Sparwood). Starting Fri Oct 4 at 7:00 AM MDT until Fri Oct 4 at 6:00 PM MDT. Shoulder will be closed. Right lane will be blocked. Last updated Fri Sep 27 at 6:01 PM MDT. (DBC-68715) |