• Events for Highway 3
  • Highway 3 Eastbound Highway 3 (Crowsnest Highway), eastbound. Utility work between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 5.2 km (Hope). Until Fri Aug 1. From 8:00 AM to 4:00 PM PDT daily. Right lane is blocked. Speed reduction to 70km/h. Last updated Fri Jul 18 at 11:33 AM PDT. (DBC-79448)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Mon Apr 21 at 12:32 PM PDT. (DBC-74724)
    Highway 3 Westbound Highway 3 (Crowsnest Highway), westbound. Utility work between Allison Pass Summit and Second Avalanche Gate for 14.7 km (40 to 54 km east of Hope). Until Fri Aug 1. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Speed reduction to 60 km/h. Last updated Fri Jun 27 at 3:55 PM PDT. (DBC-78628)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Road construction work between Garret Rd and Sunday Summit for 11.3 km (43 to 32 km west of Princeton). Until Fri Oct 31. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jun 10 at 10:05 AM PDT. (DBC-77799)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays of up to 20 minutes. Last updated Wed Jul 2 at 10:57 AM PDT. (DBC-78739)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820)
    Highway 3 Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Utility work between Junction Hwy 3A and Devon St for 1.4 km (Creston). Until Fri Aug 1 at 4:30 PM PDT. From 8:00 AM to 4:30 PM PDT on Tuesday, Wednesday, Thursday and Friday. Single lane alternating traffic. Last updated Wed Jul 23 at 8:54 AM PDT. (DBC-79519)
    Highway 3 Westbound Highway 3 (Crowsnest Highway), westbound. Road maintenance work planned between 2nd St N and 3rd Ave S for 1.1 km (Cranbrook). Starting Thu Jul 24 at 8:00 AM MDT until Thu Jul 24 at 5:00 PM MDT. Lane Closure. Watch for traffic control personnel. Last updated Wed Jul 23 at 6:53 PM MDT. (DBC-79655)
    Highway 3 Eastbound Highway 3 (Crowsnest Highway), eastbound. Utility work planned between Jaffray Village Loop Rd and Rosen Lake Rd for 1.4 km (1 to 2 km east of Jaffray). Starting Wed Aug 6 until Fri Aug 15. From 8:00 AM to 6:00 PM MDT on weekdays. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Mon Jul 21 at 9:54 AM MDT. (DBC-79512)
    Highway 3 Both Directions Highway 3 (Crowsnest Highway), in both directions. Paving operations at Cedar Ave (Fernie). Until Mon Sep 15. From 9:00 AM to 3:00 PM MDT daily. Road maintenance work. Work on shoulders. Watch for crews and traffic control. Last updated Tue Jul 15 at 6:50 PM MDT. (DBC-79287)