Highway 5 (Coquihalla South). Travel advisory in effect between Exit 231: Mine Creek Rd and Exit 250: Larson Hill for 18.6 km (12 to 31 km north of Coquihalla Summit). Wildfire activity. Limited visibility with smoke (Hope-Merritt)No stopping. Intermittent lane closures and stoppages. Speed reduction in place, slow down. Next update time Fri Sep 12 at 12:00 PM PDT. Last updated Wed Sep 10 at 12:41 PM PDT. (DBC-81233) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Construction work between Exit 183: Othello Rd and Exit 195 for 12.5 km (6 km north of Hope to 16 km south of Great Bear Snowshed). Until Fri Sep 12 at 6:00 PM PDT. Right lane closed. Construction/Rehabilitation work of Exit 195/Carolin Mine Rd between Jessica Bridge and Ladner Creek Bridge. Last updated Mon Jul 14 at 2:54 PM PDT. (DBC-79223) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Bridge maintenance at Exit 183: Othello Rd (6 km north of Hope). From 5:00 AM to 7:30 PM PDT on Tuesday, Wednesday and Thursday. Right lane closed. Last updated Mon Jul 28 at 10:39 AM PDT. (DBC-79808) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Left lane is closed in both directions. 24/7 barrier work. Please obey signage and slow down for workers. RCMP-enforced speed reduction. Next update time Mon Sep 15 at 12:00 PM PDT. Last updated Wed Aug 20 at 12:16 PM PDT. (DBC-79196) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 231: Mine Creek Rd for 6.3 km (3 to 10 km north of Coquihalla Summit). Until Tue Sep 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Dry Gulch Bridge to Henning Bridge. Delays up to 15 minutes for paving. Last updated Mon Jul 21 at 9:19 AM PDT. (DBC-79513) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512) |
Highway 5 Both Directions |
Highway 5 (Coquihalla North), in both directions. Line painting between Exit 286: Merritt - 97C and Exit 336: Walloper Interchange for 23.2 km (2 km north of Merritt to 5 km south of Surrey Lake Summit). Until Sun Sep 14. From 7:00 PM to 6:00 AM PDT daily. Lane Closure. Speed reduction to 70km/hr. Watch for crews. Last updated Thu Sep 11 at 3:11 PM PDT. (DBC-81375) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work between Avola East Frontage Rd S Access and Diamond Dr for 1.1 km (Avola). Single lane alternating traffic. Poleline maintenance. Telecom cable installation. Last updated Wed Sep 10 at 9:20 AM PDT. (DBC-81405) |
Highway 5 Northbound |
Highway 5, northbound. Ditching between Albreda Pit Rd and Camp Creek Rest Area for 14.3 km (23 to 9 km south of Valemount). Southbound lane closure. Watch for traffic control. Truck speed limit 70 km/h. Ditching work, North Bound lane reduced to 70 kilometers per hour. Next update time Tue Sep 30 at 8:30 AM PDT. Last updated Mon Jul 21 at 5:47 PM PDT. (DBC-79542) |
Highway 5 Both Directions |
Highway 5, in both directions. Road construction work between Whiskeyfill Rd and Tete Jaune Access Rd for 24.1 km (5 km south of Valemount to 1 km south of Tete Jaune). Until Mon Oct 20. From 12:00 AM to 12:00 AM PDT daily. Paving operations. Single lane alternating traffic. Pilot car controlled. Last updated Tue Sep 2 at 7:50 AM PDT. (DBC-81092) |
Highway 5 Northbound |
Highway 5, northbound. Paving operations between Cedarside Rd; Cranberry Lake Rd and Tete Jaune Access Rd for 22.3 km (2 km south of Valemount to 1 km south of Tete Jaune). Until Sat Sep 27 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Pilot car controlled. Roadside barriers removed. Watch for crews on highway. Last updated Sun Jul 13 at 8:26 PM PDT. (DBC-79166) |
Highway 5 Both Directions |
Highway 5, in both directions. Traffic signal outage planned between Walterdale Rd and Blackman Rd for 283.6 km (8 km north of Valemount to 15 km south of Barriere). Starting Sun Sep 14 at 7:00 AM PDT until Sun Sep 14 at 7:00 PM PDT. Utility work planned. BC Hydro planned power outage. No fuel or EV charging McLure to Valemount. Last updated Mon Sep 8 at 11:46 AM PDT. (DBC-81312) |