Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Maintenance between Exit 202: Portia and Exit 217: Zopkios Brake Check (1 km north of Great Bear Snowshed). Until Mon Sep 30. Roadway reduced to one lane. Expect delays. Planned Maintenance on Snowshed Tunnel with a 4.3meter width restriction in place. No loads over 4.3 meters. Obey signage. Next update time Mon Sep 30 at 5:00 PM PDT. Last updated Thu Sep 12 at 1:34 PM PDT. (DBC-68200) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Construction work between Exit 183: Othello Rd and the start of Highway 5 (Coquihalla South) for 6.2 km (6 km north of Hope to Hope). Until Mon Sep 30 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT daily. Right lane closed. Expect delays. Right lane closed for work site access. Last updated Tue Sep 3 at 6:47 AM PDT. (DBC-66612) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Maintenance between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Thu Sep 5 at 10:23 AM PDT. (DBC-67924) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Bridge maintenance at Exit 238: Juliet Rd (19 km north of Coquihalla Summit). Until Fri Oct 4. Expect delays. Road will be reduced to single lane counterflow traffic September 3 to October 4 24 hours a day. Please slow down through work zone and obey signage. Width restrictions in place, please contact permit Center. Last updated Wed Sep 4 at 10:03 PM PDT. (DBC-67845) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work planned between Palmer-Forsyth Rd and Old Hwy 5 (Kamloops). Starting Tue Oct 1 at 12:00 PM PDT until Tue Oct 1 at 5:00 PM PDT. Lane Closure. Expect minor delays. Last updated Thu Sep 26 at 2:23 PM PDT. (DBC-68661) |
Highway 5 |
Highway 5. Construction work planned between Palmer-Forsyth Rd and Old Hwy 5 (Kamloops). Starting Wed Oct 2 at 7:00 AM PDT until Sat Oct 5 at 5:00 PM PDT. Lane Closure. Expect minor delays. Last updated Thu Sep 26 at 2:26 PM PDT. (DBC-68662) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work between Carilla Rd and Clough Rd for 3.7 km (11 to 7 km south of Barriere). Lane closures in both directions in effect. No lane closures on Sunday. Reduced speed 24 hours per day. Next update time Sat Oct 19 at 11:00 AM PDT. Last updated Fri Sep 20 at 10:43 AM PDT. (DBC-66432) |
Highway 5 Southbound |
Highway 5, southbound. Tree pruning between Clearwater Valley Rd and Field Rd for 27.0 km (2 km north of Little Fort to Clearwater). Until Fri Oct 18. From 7:00 AM to 5:00 PM PDT daily. Lane closures in both directions in effect. Single lane alternating traffic. Watch for traffic control. Last updated Mon Sep 23 at 1:34 PM PDT. (DBC-68530) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work between Vavenby Bridge Rd and Skinner Rd for 14.5 km (Vavenby). Until Thu Oct 10. From 7:00 AM to 4:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Wed Sep 18 at 3:21 PM PDT. (DBC-68403) |
Highway 5 Southbound |
Highway 5, southbound. Utility work between Gosnell Rd and Moonbeam Bridge for 2.0 km (40 to 42 km north of Blue River). Until Sun Sep 29 at 5:00 PM PDT. Lane Closure. Shoulder closed. Watch for traffic control. Last updated Mon Sep 9 at 9:36 AM PDT. (DBC-66730) |