• Events for Highway 8
  • Highway 8 Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Mon Jul 21 at 8:07 PM PDT. (DBC-72877)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 12.8 km (Spences Bridge). Until Thu Jul 31. Single lane alternating traffic. SITE 9/10. Next update time Thu Jul 31 at 3:00 PM PDT. Last updated Tue Jul 22 at 3:02 PM PDT. (DBC-74796)
    Highway 8 Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Jul 25. From 5:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Sat Jul 19 at 7:21 PM PDT. (DBC-79173)
    Highway 8 Both Directions Highway 8, in both directions. Construction work at Petit Creek Rd (17 km west of Merritt). Until Fri Jul 25 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 1. The work is 3.0 km west of Petit Creek Road and extends for 0.5 km. Last updated Mon Jul 21 at 4:56 PM PDT. (DBC-79540)