Highway 97 Both Directions |
Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Landslide between Callan Rd and N Beach Rd. Road open to two-way traffic. Expect intermittent closures of 10 minutes. Next update time Mon Oct 7 at 12:30 PM PDT. Last updated Thu Aug 1 at 4:48 PM PDT. (DBC-55794) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Paving operations planned between 103rd Ave and Cherry Ave (Taylor). Starting Tue Oct 1 at 6:00 AM MST until Tue Oct 1 at 6:00 PM MST. Road closure planned. Watch for traffic control personnel. Detour planned. Detour via 100 Street or 100A Street. Next update time Tue Oct 1 at 6:00 PM MST. Last updated Thu Sep 26 at 12:12 PM MST. (DBC-68648) |
Highway 97 |
Highway 97. Utility work between Kelly Lake rd and 6572 Hwy 97. Until Mon Sep 30. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays. Please watch for signage and personnel. Last updated Thu Sep 19 at 3:40 PM PDT. (DBC-68442) |
Highway 97 |
Highway 97. Paving operations between Similkameen Ave and 14th Ave for 20.9 km (Okanagan Falls to Oliver). Until Sat Sep 28. Lane Closure. Expect delays. Last updated Thu Aug 29 at 1:24 PM PDT. (DBC-67725) |
Highway 97 |
Highway 97. Maintenance planned between William R Bennett Bridge and Pandosy St (Kelowna). Starting Sun Sep 29 at 6:30 AM PDT until Sun Sep 29 at 1:30 PM PDT. Detour planned. Lane Closure. Right turn lane will be closed. Closure at start of exit for Abbot Street to Abbot Street - Eastbound
Single Lane Closure - Right turn lane - Sept 29, 2024. Last updated Mon Sep 16 at 10:05 AM PDT. (DBC-68301) |
Highway 97 Both Directions |
Highway 97, in both directions. Maintenance between Abbott St and Old Vernon Rd for 10.0 km (Kelowna). Until Thu Oct 31 at 6:00 AM PDT. Centre lane is closed in both directions. Median Landscaping - Intermittently moving work between 10 pm and 6 am Monday, Tuesday, Wednesday from July 24 to October 31. Centre lane closed in both directions. Delay length of 5 minutes in all directions. Last updated Thu Jul 25 at 1:24 PM PDT. (DBC-66569) |
Highway 97 Both Directions |
Highway 97, in both directions. Construction work planned between Abbott St and Ellis St for 0.2 km (Kelowna). Starting Sun Oct 6 at 6:00 PM PDT until Mon Oct 7 at 6:00 AM PDT. All lanes will be blocked. Road closure planned. Detour planned. Last updated Thu Sep 26 at 1:26 PM PDT. (DBC-68651) |
Highway 97 |
Highway 97. Construction work planned between Abbott St and Pandosy St (Kelowna). Starting Mon Oct 7 at 6:00 PM PDT until Tue Oct 8 at 6:00 AM PDT. Road closure planned. Detour planned. Last updated Thu Sep 26 at 1:36 PM PDT. (DBC-68653) |
Highway 97 Northbound |
Highway 97, northbound. Construction work planned between Abbott St and Ellis St for 0.2 km (Kelowna). Starting Tue Oct 1 until Tue Oct 1 at 11:00 AM PDT. Detour planned. Right lane will be closed. Last updated Thu Sep 26 at 1:39 PM PDT. (DBC-68654) |
Highway 97 Both Directions |
Highway 97, in both directions. Construction work planned at Pandosy St (Kelowna). Starting Sat Oct 5 at 6:00 PM PDT until Sun Oct 6 at 6:00 AM PDT. Road closure planned. Detour planned. Last updated Thu Sep 26 at 1:54 PM PDT. (DBC-68658) |
Highway 97 Northbound |
Highway 97, northbound. Construction work planned between Hill Rd and Pollard Rd (1 km north of Kelowna). Starting Thu Oct 3 at 7:00 AM PDT until Thu Oct 3 at 3:00 PM PDT. Right turn lane will be closed. Last updated Thu Sep 26 at 1:59 PM PDT. (DBC-68659) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Bridge construction between Stephenson Rd and Stage Rd for 0.1 km (Cache Creek). Until Mon Sep 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Expect minor delays. Last updated Thu Jul 18 at 12:47 PM PDT. (DBC-65990) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Mon Sep 30. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:30 PM PDT. (DBC-67758) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Construction work between Lynes Creek Rd and Robertson Rd for 10.5 km (21 to 10 km north of Wildwood). From 7:00 AM to 7:00 PM PDT daily. Watch for temporary road markings and shouldering. Next update time Fri Oct 4 at 10:00 AM PDT. Last updated Fri Sep 27 at 2:27 PM PDT. (DBC-66273) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Paving operations between Soda Creek-MacAlister Rd and Davis Rd for 27.5 km (39 km north of Wildwood to 32 km south of Quesnel). Until Sat Oct 5. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for crews and paving equipment. Expect delays. Last updated Tue Sep 17 at 7:00 PM PDT. (DBC-68378) |
Highway 97 |
Highway 97 (Cariboo Connector). Ditching between Soda Creek-MacAlister Rd and Ross Rd for 20.5 km (39 km south of Quesnel to 39 km north of Wildwood). Until Mon Sep 30 at 5:00 PM PDT. Construction work. Northbound lane closure. Expect minor delays. There will be placement of concrete roadside barriers. Please watch for signs and crews. Last updated Thu Sep 5 at 11:49 AM PDT. (DBC-66666) |
Highway 97 |
Highway 97 (Cariboo Connector). Road construction work between Pollard Rd and Umiti Pit Rd for 3.8 km (15 to 11 km north of Quesnel). Until Fri Oct 25. From 7:00 AM to 7:00 PM PDT daily. Northbound lane closure. Single-lane alternating traffic September 19 to October 17. Please watch for signage and personnel. Expect speed reductions as well as minor delays of up to 20 minutes. Next update time Thu Oct 17 at 11:00 AM PDT. Last updated Tue Sep 17 at 1:13 PM PDT. (DBC-66606) |
Highway 97 |
Highway 97 (Cariboo Connector). Utility work between Lucas Rd and Colebank Rd E for 1.4 km (6 to 4 km north of Hixon). Until Fri Oct 4 at 4:00 PM PDT. Single lane alternating traffic. Northbound lane closure. Expect delays of up to 10 minutes. Please watch for signs and personnel. Last updated Thu Sep 5 at 2:26 PM PDT. (DBC-67942) |
Highway 97 Both Directions |
Highway 97, in both directions. Construction work between 22nd Ave and 5th Ave for 1.9 km (Prince George). Until Sat Oct 26. Right lane closed. Work will be periodic in the curb lanes with traffic control in place. Last updated Tue Sep 24 at 5:06 PM PDT. (DBC-68583) |
Highway 97 Northbound |
Highway 97, northbound. Utility work planned at 15th Ave (Prince George). Starting Tue Oct 1 at 8:00 AM PDT until Wed Oct 2 at 5:00 AM PDT. Last updated Wed Sep 25 at 3:15 PM PDT. (DBC-68610) |
Highway 97 Southbound |
Highway 97, southbound. Utility work planned between North Nechako Rd and 5th Ave (Prince George). Starting Sat Oct 5 at 5:00 PM PDT until Tue Oct 8 at 5:00 PM PDT. Centre lane will be closed. Last updated Thu Sep 19 at 1:47 PM PDT. (DBC-68434) |
Highway 97 Southbound |
Highway 97, southbound. Utility work planned between North Nechako Rd and 5th Ave (Prince George). Starting Tue Oct 8 at 5:00 PM PDT until Thu Oct 24 at 9:00 PM PDT. Road closure planned. Last updated Thu Sep 19 at 1:51 PM PDT. (DBC-68435) |
Highway 97 Southbound |
Highway 97, southbound. Utility work planned between North Nechako Rd and 5th Ave for 1.2 km (Prince George). Starting Tue Oct 1 at 5:00 AM PDT until Sat Oct 5 at 5:00 PM PDT. Right lane will be closed. Last updated Thu Sep 19 at 1:33 PM PDT. (DBC-68433) |
Highway 97 Northbound |
Highway 97, northbound. Utility work planned between Blueberry Rd and Northwood Pulpmill Rd for 0.6 km (Prince George). Starting Tue Oct 1 at 7:00 PM PDT until Fri Oct 4 at 6:00 AM PDT. Right lane will be closed. Last updated Mon Sep 23 at 10:16 AM PDT. (DBC-67146) |
Highway 97 Southbound |
Highway 97, southbound. Maintenance between Nordic Dr and Austin Rd for 1.0 km (Prince George). Until Tue Oct 1. Exit ramp is closed. Last updated Thu Sep 5 at 4:39 PM PDT. (DBC-67959) |
Highway 97 Both Directions |
Highway 97, in both directions. Construction work between Summit Lake Rd and Tallus Rd for 1.5 km (36 to 34 km north of Prince George). Until Wed Oct 2 at 7:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Tue Aug 27 at 3:54 PM PDT. (DBC-67651) |
Highway 97 Both Directions |
Highway 97, in both directions. Utility work between Grizzly Ave and Tudyah Lake Provincial Pk for 71.6 km (57 km north of Prince George to 7 km north of McLeod Lake). Until Thu Oct 3 at 4:00 PM PDT. Shoulder closed. Lane Closure. Watch for traffic control. Last updated Fri Aug 23 at 3:29 PM PDT. (DBC-67523) |
Highway 97 Southbound |
Highway 97, southbound. Garbage pickup planned between Haight Rd and Industrial Way for 1.9 km (58 km south of McLeod Lake to 60 km north of Prince George). Starting Fri Oct 4 at 9:00 AM PDT until Fri Oct 4 at 12:00 PM PDT. Shoulder will be closed. Last updated Wed Sep 25 at 3:09 PM PDT. (DBC-68609) |
Highway 97 Both Directions |
Highway 97, in both directions. Utility work planned between Kennedy Rd and Azu Sub Rd for 2.1 km (27 to 25 km south of Pine Pass Summit). Starting Tue Oct 15 at 8:00 AM PDT until Tue Oct 15 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Fri Sep 27 at 2:10 PM PDT. (DBC-68702) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Powder King Rd and Old Hasler Rd (49 km south of Chetwynd). Single lane alternating traffic and detour at Fisher Creek Bridge. Estimated time of re-opening Thu Oct 31 at 7:00 AM MST. Next update time Thu Oct 31 at 7:00 AM MST. Last updated Mon Sep 16 at 9:06 AM MST. (DBC-66238) |
Highway 97 |
Highway 97 (Alaska Highway). Road construction work between Pingel Creek Rd and Pingel Creek Rd (4 km south of Taylor). Until Mon Sep 30 at 7:00 PM MST. Detour in effect. Watch for traffic control. Watch for crews and equipment working, slow down when approaching detour and driving past worksite. Next update time Mon Sep 30 at 4:00 PM MST. Last updated Mon Sep 16 at 3:34 PM MST. (DBC-67988) |
Highway 97 |
Highway 97 (Alaska Highway). Bridge maintenance between Taylor Bridge and McMahon Dr for 1.1 km (Taylor). Until Sat Oct 12 at 3:00 AM MST. From 7:00 PM to 3:00 AM MST on weekdays. Single lane alternating traffic. Expect major delays. Overweight and oversized loads exceeding width of 3.85m must wait until after 3am to cross. To avoid lengthy delay schedule oversize loads 7pm-3am. Contact Angie Crawford @DRM 250-262-2600 for questions. Last updated Tue Sep 17 at 5:49 AM MST. (DBC-68125) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Maintenance between 285 Rd and 256 Rd for 10.2 km (30 to 20 km north of Fort St John). Until Mon Sep 30 at 6:00 PM MST. Single lane alternating traffic. Tree trimming. 50 km/hr. Short 5 to 10 minute holds. Emergency services, school buses and road maintenance vehicles will have the right of way. Last updated Fri Aug 2 at 9:26 AM MST. (DBC-66811) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Bridge maintenance between 115 Creek Campground and Callison Rd (166 km north of Fort Nelson). Single lane alternating traffic. Watch for traffic control. Next update time Tue Oct 1 at 9:00 AM MST. Last updated Tue Sep 10 at 8:32 AM MST. (DBC-67877) |