• Events for Highway 97
  • Highway 97 Highway 97. Utility work between Soda Creek Substation and Pinnel Road. Until Wed Sep 3. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Last updated Wed Aug 13 at 2:28 PM PDT. (DBC-80435)
    Highway 97 Highway 97. Bridge construction at Tetsa River #1 Bridge. Until Mon Sep 15. From 7:00 AM to 7:00 PM MST daily. Single lane alternating traffic. Tetsa River #1 Substructure Rehabilitation. Width restriction of 3.8m OAW. Last updated Tue Aug 19 at 3:12 PM MST. (DBC-80654)
    Highway 97 Northbound Highway 97, northbound. Utility work at 100 Mile House. Until Sun Sep 21. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Slow down and obey all traffic control personnel and signage. Delays of 5 minutes. Last updated Thu Sep 4 at 8:35 AM PDT. (DBC-80883)
    Highway 97 Northbound Highway 97, northbound. Utility work planned between Maple Drive and Balsam Ave 7 km south of Quesnel. Starting Mon Sep 15 until Fri Sep 19. From 7:30 AM to 6:30 PM PDT on weekdays. Shoulder will be closed. Please watch for traffic control signage and personnel. Last updated Thu Sep 4 at 10:37 AM PDT. (DBC-81198)
    Highway 97 Southbound Highway 97, southbound. Utility work planned between Airport Road and Stevens Road 6 km north of Quesnel. Starting Mon Sep 15 until Fri Sep 19. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder will be closed. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Thu Sep 4 at 4:01 PM PDT. (DBC-81211)
    Highway 97 Both Directions Highway 97, in both directions. Shoulder maintenance between 100th Ave and 13th Ave for 40.1 km (Okanagan Falls to 1 km north of Osoyoos). Until Wed Oct 1 at 5:00 PM PDT. Mowing. Watch for slow moving vehicles. There will also be gravel, as they are adding gravel to the shoulders. Last updated Wed Sep 3 at 1:21 PM PDT. (DBC-81088)
    Highway 97 Northbound Highway 97, northbound. Road construction work between Pineview Dr and Sandhill Rd (1 km south of Penticton). Until Wed Oct 29. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Shoulder closed. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Mon Aug 11 at 4:45 PM PDT. (DBC-71783)
    Highway 97 Southbound Highway 97, southbound. Road maintenance work between Sage Mesa Dr and Green Lake Rd for 22.0 km (Okanagan Falls to 2 km north of Penticton). From 7:30 AM to 4:30 PM PDT on Wednesday and Thursday. Right lane will be closed. Watch for crew & equipment. Use caution & reduce speed when passing. Last updated Mon Aug 25 at 11:14 AM PDT. (DBC-80142)
    Highway 97 Eastbound Highway 97, eastbound. Tree pruning planned between Monte Creek and Duck Range Rd for 4.4 km (5 to 1 km east of Monte Creek). Starting Tue Sep 23 at 8:00 AM PDT until Sat Sep 27 at 4:00 PM PDT. Right lane will be closed. Last updated Wed Sep 10 at 2:49 PM PDT. (DBC-81422)
    Highway 97 Highway 97 (Cariboo Connector). Utility work planned at Stage Rd (Cache Creek). Starting Wed Sep 17 at 10:00 AM PDT until Wed Sep 17 at 4:00 PM PDT. Right lane will be blocked. Pole access for Telus Cable drops. Last updated Wed Sep 10 at 9:01 AM PDT. (DBC-81400)
    Highway 97 Northbound Highway 97 (Cariboo Connector), northbound. Utility work between Scottie Creek Rd and Loon Lake Rd for 2.5 km (17 km south of Clinton to 18 km north of Cache Creek). Until Tue Sep 16. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Please watch for traffic control. Expect minor delays of up to five minutes. Last updated Mon Aug 25 at 11:41 AM PDT. (DBC-80856)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Vehicle incident between Meadow Lake Rd and Chasm Rd for 1.4 km (13 km north of Clinton to 14 km south of 70 Mile House). Single lane alternating traffic. Last updated Thu Sep 11 at 3:15 PM PDT. (DBC-81066)
    Highway 97 Northbound Highway 97 (Cariboo Connector), northbound. Paving operations planned between Taylor Ave and First St for 0.3 km (100 Mile House). Starting Wed Sep 24 until Thu Sep 25. From 8:00 AM to 4:00 PM PDT on Wednesday and Thursday. Lane Closure. Last updated Wed Sep 10 at 9:02 AM PDT. (DBC-81401)
    Highway 97 Highway 97 (Cariboo Connector). Utility work between Clear Rd N and Kragbak Rd for 7.7 km (Wildwood). Until Thu Oct 9. From 8:00 AM to 4:00 PM PDT on weekdays. Please watch for traffic control signage and personnel. Expect minor delays of up to five minutes. Shoulder lane will be closed. Last updated Tue Sep 2 at 11:06 AM PDT. (DBC-81102)
    Highway 97 Southbound Highway 97 (Cariboo Connector), southbound. Construction work planned between Stevens Rd and Finning Rd for 5.0 km (Quesnel). Starting Mon Sep 22 until Fri Sep 26. From 7:00 AM to 5:00 PM PDT on weekdays. Lane Closure. Expect delays. Last updated Wed Sep 10 at 9:04 AM PDT. (DBC-81402)
    Highway 97 Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Next update time Tue Sep 30 at 10:00 AM PDT. Last updated Mon Jun 30 at 10:04 AM PDT. (DBC-71474)
    Highway 97 Highway 97. Utility work planned between Noranda Rd and Collins Rd for 0.6 km (Prince George). Starting Wed Sep 17 at 6:00 AM PDT until Sat Sep 20 at 6:00 PM PDT. Right lane will be closed. Last updated Tue Aug 5 at 8:12 AM PDT. (DBC-80093)
    Highway 97 Both Directions Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426)
    Highway 97 Highway 97. Utility work between Powder King Rd and Old Hasler Rd for 26.5 km (Pine Pass Summit). Until Tue Sep 30. From 7:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Fri Aug 22 at 10:38 AM PDT. (DBC-80768)
    Highway 97 Southbound Highway 97, southbound. Ditching between Hasler Rd and Powder King Rd for 47.1 km (33 km north of Pine Pass Summit to 23 km south of Chetwynd). Until Fri Sep 12 at 4:30 PM MST. From 6:30 AM to 4:30 PM MST on Tuesday, Wednesday, Thursday and Friday. Single lane alternating traffic. Slow down. Watch for crew and equipment in the area. Last updated Tue Sep 9 at 7:59 AM MST. (DBC-81347)
    Highway 97 Highway 97 (Alaska Highway). Road construction work planned between 221 Rd and Historic Milepost 3 for 0.2 km (1 km north of Dawson Creek). Starting Mon Sep 15 at 7:00 AM MST until Wed Sep 24 at 5:00 PM MST. Single lane alternating traffic will be in effect. Watch for traffic control, Hwy 2 access to Trading Post Rd near Swamp Donkey will be closed for duration of works. Last updated Wed Sep 10 at 10:50 AM MST. (DBC-81410)
    Highway 97 Both Directions [Truncated] Highway 97 (Alaska Highway), in both directions. Bridge maintenance planned between Big Bam Rd and Taylor Bridge for 0.1 km (Taylor). Starting Mon Sep 22 at 7:00 PM MST until Fri Oct 10 at 3:30 AM MST. From 7:00 PM to 3:30 AM MST on weekdays. Single lane alternating traffic will be in effect. Expect delays. Bridge Welding on Taylor Bridge. Please drive posted speed limits, and slow down for crews and equipment, please contact DRM 250-262-2600 if load is overweight or wider than 12.6'
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Utility work between 269 Rd and Hemlock Rd (1 km north of Fort St John). Until Fri Sep 19 at 5:00 PM MST. Shoulder closed. Telecom conduit and cable installation. Last updated Mon Sep 8 at 10:47 AM MST. (DBC-81303)
    Highway 97 Southbound Highway 97 (Alaska Highway), southbound. Utility work between Charlie Lake Cres and Bens Rd for 1.0 km (8 to 7 km north of Fort St John). Until Fri Sep 19 at 5:00 PM MST. Shoulder closed. Telecom conduit and cable installation. Last updated Mon Sep 8 at 10:53 AM MST. (DBC-81306)