Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT on weekdays. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Last updated Sun Mar 30 at 8:40 AM PDT. (DBC-74159) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between W Pender St and Lions Gate Bridge for 3.3 km (West Vancouver to Vancouver). Starting Sun Apr 27 at 7:00 AM PDT until Sun Apr 27 at 11:30 AM PDT. Expect delays due to congestion. Lane Closure. VancouverSunRun.Com for additional information. Last updated Mon Mar 17 at 10:21 AM PDT. (DBC-74046) |
Highway 99 Northbound |
Highway 99, northbound. Electrical maintenance between Scott Cres and Cleveland Ave (Squamish). Until Fri May 2. Right turn lane closed. Shoulder closed. Next update time Fri May 2 at 6:00 AM PDT. Last updated Fri Mar 28 at 1:34 PM PDT. (DBC-74602) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Scott Cres and Cleveland Ave (Squamish). Starting Fri May 2 until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane will be closed. Shoulder will be closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping planned between Exit 3: Horseshoe Bay Junction and Spring Creek Dr for 94.3 km (Whistler to West Vancouver). Starting Tue Apr 22 until Fri Apr 25. From 7:30 AM to 5:30 PM PDT daily. Shoulder will be closed. Watch for slow moving vehicles. Last updated Thu Apr 17 at 1:24 PM PDT. (DBC-75525) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 Both Directions |
Highway 99, in both directions. Rock slope stabilization planned between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Starting Thu Apr 24 at 7:00 AM PDT until Sat Jun 21 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 17 at 3:13 PM PDT. (DBC-75530) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping between Seton Lake Rd and Pavilion-Clinton Rd for 34.4 km (Lillooet). Until Fri May 2 at 3:00 PM PDT. From 7:30 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Watch for slow moving vehicles and sweeper working. Last updated Mon Apr 7 at 6:14 PM PDT. (DBC-75027) |
Highway 99 |
Highway 99. Utility work between Sallus Creek Rd and Pavilion-Clinton Rd for 10.8 km (29 to 18 km north of Lillooet). Until Thu Apr 24. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Apr 9 at 8:25 AM PDT. (DBC-75107) |