Highway 101 Both Directions |
Highway 101, in both directions. Special event planned at Alberni St (Powell River). Starting Mon Sep 30 at 11:30 AM PDT until Mon Sep 30 at 12:30 PM PDT. Road closure planned. The road will be closed from Alberni Street to Westview Avenue in Powell River for the National Day of Truth and Reconciliation March. Next update time Mon Sep 30 at 12:30 PM PDT. Last updated Mon Sep 23 at 9:06 AM PDT. (DBC-68512) |
Highway 17 Eastbound |
Highway 17, eastbound. Construction work planned between Tannery Rd and Bridgeview Dr for 3.3 km (Surrey). Starting Wed Oct 2 at 9:00 PM PDT until Thu Oct 3 at 5:00 AM PDT. Road closure planned. Traffic will be detoured at Tannery Rd. To 120th St. Next update time Thu Oct 3 at 5:00 AM PDT. Last updated Fri Sep 27 at 10:53 AM PDT. (DBC-68619) |
Other Roads Eastbound |
Main St., eastbound. Paving operations planned at Highway 1 Onramp. Starting Sun Oct 6 until Wed Oct 9. From 9:00 PM to 5:00 AM PDT daily. Nightly closure of the onramp. A local detour is in effect. Watch for traffic control and expect delays. Next update time Wed Oct 9 at 5:00 AM PDT. Last updated Tue Sep 24 at 10:35 AM PDT. (DBC-68563) |
Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Possible ferry delays between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Until Mon Sep 30 at 12:00 PM PDT. Ferry may carry reduced loads due to low water levels. Max 13,000kg or up to 4 cars. Last updated Fri Sep 27 at 3:54 PM PDT. (DBC-68710) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Paving operations planned between Exit 3 and Westport Rd (West Vancouver). Starting Wed Oct 2 until Thu Oct 3. From 9:00 PM to 5:00 AM PDT on Wednesday and Thursday. Lane Closure. Watch for traffic control personnel. Last updated Fri Sep 27 at 3:06 PM PDT. (DBC-68708) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 13 and Keith Rd for 0.8 km (West Vancouver). Until Fri Oct 11 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT daily. Possible delays. Shoulder maintenance. Sign placement
Work is from Exit 13 to Hadden Drive. Last updated Tue Jul 9 at 5:49 PM PDT. (DBC-66044) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned at Exit 17: Westview Dr (North Vancouver - City). Starting Thu Oct 10 at 7:00 AM PDT until Fri Oct 25 at 5:00 PM PDT. Watch for crews and obey signage northbound on Westview Drive. Last updated Thu Sep 19 at 4:31 PM PDT. (DBC-68444) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned between Exit 18: Lonsdale Ave and Exit 17: Westview Dr (North Vancouver - City). Starting Thu Oct 10 at 7:00 AM PDT until Fri Oct 25 at 5:00 PM PDT. Rogers civil build. Last updated Fri Sep 20 at 11:49 AM PDT. (DBC-68462) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Construction work between Exit 37: Gaglardi Way and King Edward St for 3.2 km (Burnaby to Coquitlam). Until Fri Feb 28, 2025 at 7:00 AM PDT. From 9:30 PM to 7:00 AM PDT daily. Lane Closure. Expect delays. Lane closures are needed to move materials & equipment for the construction of TransLink's North Rd maintenance facility. Last updated Fri Sep 13 at 10:04 PM PDT. (DBC-60503) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between 208 St and Exit 73 for 9.3 km (Langley - District). Until Sat Nov 30 at 5:00 AM PDT. Lane Closure. Expect minor delays. Last updated Tue Jun 25 at 9:00 AM PDT. (DBC-65554) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work at Exit 73 (Langley - District). Until Tue Oct 1. From 8:30 PM to 8:00 AM PDT daily. Lane closures in both directions in effect. Watch for traffic control. Last updated Mon Sep 9 at 3:39 PM PDT. (DBC-68062) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work at Exit 73 (Langley - District). Entrance ramp closed. Utility line down. Last updated Mon Sep 16 at 4:48 AM PDT. (DBC-68282) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Bradner Rd and Peardonville Rd for 2.4 km (Abbotsford). Until Mon Sep 30. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is closed in both directions. Last updated Fri Aug 23 at 10:08 AM PDT. (DBC-67506) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Peardonville Rd and Exit 90: McCallum Rd for 5.0 km (Abbotsford). Until Mon Sep 30. From 8:30 PM to 5:30 AM PDT on weekdays. Left lane is blocked. Watch for traffic control. Last updated Fri Aug 23 at 10:03 AM PDT. (DBC-67505) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Paving operations planned between Exit 170 and Exit 171: Old Hope-Princeton Highway for 0.6 km (Hope). Starting Sat Oct 5 at 7:00 AM PDT until Sat Oct 5 at 6:00 PM PDT. Exit ramp will be closed. Detour planned. Exit 170 will be closed. Use Exit 173 as detour. Follow construction signs. Expect delays. Last updated Fri Sep 27 at 5:17 PM PDT. (DBC-68717) |
Highway 1 |
Highway 1 (TransCanada Highway). Paving operations planned between Exit 171: Old Hope-Princeton Highway and Haig Station Rd for 2.2 km (Hope). Starting Tue Oct 1 at 7:00 AM PDT until Sat Oct 5 at 6:00 PM PDT. Some intersections will be closed during working hours. Follow construction signs. Expect delays. Last updated Fri Sep 27 at 5:18 PM PDT. (DBC-68716) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work between Victoria St and Emory Creek Campground for 5.8 km (Yale). Until Fri Oct 4 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Last updated Fri Sep 13 at 1:56 PM PDT. (DBC-68239) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Maintenance planned between Spuzzum Creek Rd and Tuckkwiowhum Rd for 18.3 km (18 km north of Yale to 30 km south of Jackass Mountain Summit). Starting Tue Oct 1 until Fri Oct 4. From 7:00 AM to 4:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Expect minor delays. Ferrabee Wall Catchment clean out. Last updated Tue Sep 24 at 7:45 AM PDT. (DBC-68559) |
Highway 10 Both Directions |
Highway 10, in both directions. Road construction work between 70th Ave and 75 Ave 1 km north of Langley - City. Until Thu Dec 19. From 8:00 PM to 5:00 AM PDT daily. Last updated Wed Sep 4 at 4:12 PM PDT. (DBC-67896) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work between 136 St and 144 St for 0.6 km (Surrey). Until Fri Nov 29 at 4:00 PM PDT. Watch for slow moving trucks entering and exiting the Surrey Substation. Last updated Fri Sep 20 at 5:08 PM PDT. (DBC-68474) |
Highway 10 Eastbound |
Highway 10, eastbound. Utility work planned at 176A St (Surrey). Starting Thu Oct 3 until Thu Oct 10. From 10:00 PM to 5:00 AM PDT on weekdays. Left turn lane will be closed. Left lane will be closed. For sewer inspection from 175th Street to 176A Street. Last updated Tue Sep 17 at 5:46 AM PDT. (DBC-68308) |
Highway 10 |
Highway 10. Construction work at Worrell Cres (Langley - District). Until Thu Dec 19 at 5:00 PM PDT. Work is between 70th Ave. And 75th Ave. Last updated Mon Aug 19 at 8:47 AM PDT. (DBC-67327) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Thu Oct 10 at 4:00 PM PDT. Watch for construction crews and vehicles crossing. Expect minor delays. Last updated Thu Sep 12 at 3:01 PM PDT. (DBC-68205) |
Highway 101 Both Directions |
Highway 101, in both directions. Road construction work at Monkey Tree Lane (Sechelt). Until Mon Sep 30. From 7:00 AM to 7:00 PM PDT daily. Right lane closed. Shoulder closed. Road closed intermittently. At Matukwum Lane. Last updated Thu Aug 8 at 12:08 PM PDT. (DBC-66799) |
Highway 101 |
Highway 101. Utility work planned between Sunnycrest Rd and Shaw Rd (Gibsons). Starting Tue Oct 1 at 9:00 AM PDT until Tue Oct 1 at 3:00 PM PDT. Last updated Mon Sep 16 at 8:14 AM PDT. (DBC-67675) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work between Valley Rd and Bateman Rd for 0.6 km (Abbotsford). Until Sat Oct 5. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. Expect delays. Sep 9-14, Sep 16-21, Sep 23-28, Oct 1-5. Hours of operation 7:00am-5:00pm. No traffic disruptions on Sep 30. Highway 11 - northbound/southbound 4 lane shift, 50 km/h speed zone. Last updated Sat Sep 7 at 3:38 PM PDT. (DBC-67048) |
Highway 11 Both Directions |
Highway 11, in both directions. Construction work at Cedar Valley Conn (Mission). Until Sat Oct 5. Watch for traffic control. Expect delays. Highway 11 - London Ave-200m north of Highway 7 on Cedar Valley Connector. Highway 7 - Hurd St.-Haig St. Sep 9-14, 16-21, 23-27 Oct 1-5. Sunday-Friday 9pm-5:30am. Saturday 9pm-6:30am. No traffic disruptions Sep 30. Last updated Sat Sep 7 at 3:40 PM PDT. (DBC-68005) |
Highway 15 Both Directions |
Highway 15 (Pacific Highway), in both directions. Roadside brushing between 68A Ave and 80 Ave (Surrey). Until Mon Sep 30 at 2:30 PM PDT. Lane closures in both directions in effect. Last updated Thu Sep 12 at 3:05 PM PDT. (DBC-68206) |
Highway 17 Both Directions |
Highway 17, in both directions. Shoulder maintenance between Highway 91 Connector and Grace Rd (Delta). Until Fri Nov 1. From 7:00 AM to 5:00 PM PDT daily. Expect intermittent lane / ramp closures and stoppages in both directions. Watch for traffic control. Travelers to River Road West are advised to follow detour signage. Last updated Tue Sep 17 at 10:45 AM PDT. (DBC-68331) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Exit 177 and First Avalanche Gate for 4.7 km (3 to 8 km east of Hope). Until Thu Oct 31 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on weekdays and Saturday. Blasting. Expect delays. Last updated Tue Sep 3 at 6:47 AM PDT. (DBC-67647) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work planned between Sunshine Valley and Manning Park Resort for 46.2 km (17 to 64 km east of Hope). Starting Wed Oct 2 at 6:00 AM PDT until Fri Oct 4 at 7:00 PM PDT. Watch for trucks turning. Last updated Thu Sep 26 at 3:18 PM PDT. (DBC-67263) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Industrial traffic may slow or block regular traffic. Between Allison Pass Summit and Manning Park Resort for 7.4 km (56 to 64 km east of Hope). Until Mon Sep 30. From 6:00 AM to 7:00 PM PDT daily. Watch for traffic control. Last updated Fri Aug 16 at 4:22 PM PDT. (DBC-67277) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations planned between Allison Pass Summit and Owl Way for 9.3 km (64 to 54 km east of Hope). Starting Wed Oct 2 until Fri Oct 4. From 7:00 AM to 7:00 PM PDT on weekdays. Lane closures in both directions planned. Paving and Spillways repair. Last updated Thu Sep 26 at 10:44 AM PDT. (DBC-68465) |
Highway 5 Southbound |
Highway 5 (Coquihalla South), southbound. Construction work between Exit 183: Othello Rd and the start of Highway 5 (Coquihalla South) for 6.2 km (6 km north of Hope to Hope). Until Mon Sep 30 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT daily. Right lane closed. Expect delays. Right lane closed for work site access. Last updated Tue Sep 3 at 6:47 AM PDT. (DBC-66612) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Maintenance between Exit 183: Othello Rd and Exit 192 for 9.0 km (6 to 15 km north of Hope). Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Watch for traffic control. Last updated Thu Sep 5 at 10:23 AM PDT. (DBC-67924) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between 266 St and 272 St for 0.5 km (Maple Ridge). Until Sat Oct 5. Watch for traffic control. Expect delays. Sep 9-14, Sep 16-21, Sep 23-27, Oct 1-5. 7:00am-5:00pm. No traffic disruptions on Sep 30. River Rd, westbound/eastbound - 287th St, northbound/southbound - single lane alternating traffic as needed. Last updated Sat Sep 7 at 8:07 PM PDT. (DBC-67049) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work at Glasgow Ave (Mission). From 7:30 PM to 5:00 AM PDT daily. Single lane alternating traffic. Next update time Fri Oct 11 at 5:30 AM PDT. Last updated Wed Sep 25 at 1:33 AM PDT. (DBC-67696) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road maintenance work planned between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Starting Sun Sep 29 until Sat Oct 12. From 9:00 AM to 3:00 PM PDT daily. Expect minor delays. Last updated Fri Sep 27 at 12:11 PM PDT. (DBC-68697) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Maintenance at S River Rd (3 km east of Mission). Until Sat Sep 28. From 9:00 AM to 3:00 PM PDT daily. Lane Closure. From 1km east to 1km west of the Dewdney Bridge. Last updated Mon Sep 16 at 10:59 AM PDT. (DBC-68306) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Tree pruning between Taylor Rd and Beach Camp Rd for 12.5 km (1 km west of Kent to 13 km east of Mission). Until Fri Nov 1. From 9:00 AM to 4:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Fri Sep 20 at 10:50 AM PDT. (DBC-68459) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Utility work between Mill Rd and Highlands Blvd for 1.1 km (Kent). Until Fri Oct 4. From 9:00 AM to 3:00 PM PDT daily. Right lane is blocked. Speed reduced to 60 km/h. Last updated Fri Sep 20 at 10:46 AM PDT. (DBC-68458) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Roadside brushing between Cameron Rd and Wilson Rd for 2.7 km (Kent). Single lane alternating traffic. Please watch for loader and brush head. Last updated Thu Sep 19 at 6:21 AM PDT. (DBC-68415) |
Highway 7 Westbound |
Highway 7 (Lougheed Highway), westbound. Construction work between Johnson Slough Rest Area and Wahleach Rd for 3.4 km (Kent). Until Sat Nov 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Right lane closed. Shoulder closed. Watch for traffic control. Last updated Wed Aug 7 at 2:21 PM PDT. (DBC-66954) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Wahleach Rd and Johnson Slough Rest Area (Kent). Until Sat Nov 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Reduced speed zone. Watch for traffic control personnel. Last updated Thu Aug 8 at 5:01 PM PDT. (DBC-67009) |
Highway 7B Westbound |
Highway 7B (Mary Hill Bypass), westbound. Utility work planned between the end of Highway 7B (Mary Hill Bypass) and Kingsway Ave (Port Coquitlam). Starting Tue Oct 1 until Wed Oct 2. From 7:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Right turn lane will be closed. Watch for traffic control personnel. Detour planned. Detour available via Coast Meridian or Broadway St. Last updated Fri Sep 27 at 7:45 PM PDT. (DBC-68660) |
Highway 91 Both Directions |
Highway 91, in both directions. Shoulder maintenance between Exit 8: Nordel Way and Exit 6: 72 Ave (Delta). Until Fri Nov 1. From 7:00 AM to 5:00 PM PDT daily. Expect intermittent lane / ramp closures and stoppages in both directions. Watch for traffic control. Last updated Mon Sep 16 at 5:04 PM PDT. (DBC-68329) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Exit 20 and Exit 26 for 4.7 km (Delta). Until Thu Oct 31. Right turn lane closed. Right lane closed. For ground densification and improvement. Last updated Fri Jul 26 at 3:16 PM PDT. (DBC-66614) |
Highway 99 Northbound |
Highway 99, northbound. Construction work between Exit 20 and Exit 26 for 4.7 km (Delta). Until Wed Nov 6. From 6:30 AM to 3:00 PM PDT on weekdays. Right lane closed. Expect delays due to congestion. Last updated Mon Sep 23 at 11:04 AM PDT. (DBC-68524) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Deas Thruway and Exit 32: Steveston Hwy (Richmond). Starting Tue Oct 1 at 11:00 PM PDT until Wed Oct 2 at 5:00 AM PDT. Road closure planned. Detour planned. The 99 northbound loop will be closed. Last updated Thu Sep 26 at 4:30 PM PDT. (DBC-68668) |
Highway 99 Southbound |
Highway 99, southbound. Construction work between Blundell Rd and Exit 32: Steveston Hwy for 2.5 km (Richmond). Until Fri Jan 31, 2025. From 10:00 PM to 5:00 AM PDT on weekdays. Lane Closure. Expect delays. Last updated Fri Aug 30 at 3:14 PM PDT. (DBC-67769) |
Highway 99 Northbound |
Highway 99, northbound. Utility work between Marine Dr and Clyde Ave for 0.1 km (West Vancouver). Until Mon Oct 7. From 7:30 AM to 5:30 PM PDT on weekdays. Signage placement on Taylor way for servicing work on Clyde Avenue. Last updated Fri Sep 20 at 11:08 AM PDT. (DBC-68460) |
Highway 99 Both Directions |
Highway 99, in both directions. Utility work planned between Finch Dr and Industrial Way for 93.7 km (Squamish to Pemberton). Starting Tue Oct 1 at 7:00 PM PDT until Fri Oct 4 at 6:00 AM PDT. Lane Closure. Performing underground utility sweeps. Only one lane will be closed at a time. Last updated Wed Sep 25 at 3:44 PM PDT. (DBC-68613) |
Highway 99 Northbound |
Highway 99, northbound. Construction work between Park St and Portage Rd (Pemberton). Until Sun Sep 29 at 6:00 PM PDT. Shoulder closed. Work is for the drilling of new watermain at junction of Pemberton Meadows Road and Collins Road. Last updated Wed Jun 26 at 4:07 PM PDT. (DBC-65613) |
Highway 99 Both Directions |
Highway 99, in both directions. Geotechnical investigation planned between Main St and Davis Rd for 91.5 km (1 km north of Pemberton to Lillooet). Starting Mon Oct 21 until Fri Nov 22 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for crews working at various sites between Mount Currie and Lillooet. Last updated Tue Sep 24 at 4:33 PM PDT. (DBC-68582) |
Other Roads Both Directions |
E Porpoise Bay Rd, in both directions. Construction work between Wharf Ave and Delta Rd. Until Thu Oct 31 at 6:00 PM PDT. From 7:00 AM to 8:00 PM PDT daily. Single lane alternating traffic. Expect minor delays. Next update time Thu Oct 31 at 10:00 AM PDT. Last updated Wed Aug 28 at 11:03 AM PDT. (DBC-64787) |
Other Roads Both Directions |
Othello Road, in both directions. Road construction work between Highway 5 and Tunnel Road. Until Tue Dec 31 at 7:00 PM PDT. From 6:00 AM to 7:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays. Last updated Fri Jul 26 at 2:59 PM PDT. (DBC-64917) |
Other Roads Both Directions |
NW Marine Drive, in both directions. Utility work at Acadia Rd. Until Tue Dec 31 at 7:00 PM PDT. Lane Closure. NW Marine Dr. And Acadia Rd sewer separation and watermain work. Last updated Thu Jul 25 at 4:32 PM PDT. (DBC-66577) |
Other Roads |
Mountain Highway. Paving operations at Main Street. Until Mon Sep 30. From 7:00 PM to 5:00 AM PDT on weekdays. Road construction work. Lane Closure. Main Street And Mountain Highway Intersection Improvements Project. Nightly Lane closures and traffic control for Drainage improvements and repaving. Last updated Tue Aug 6 at 5:31 PM PDT. (DBC-66923) |
Other Roads |
Redrooffs Rd. Construction work between Hwy 101 and Cove Rd. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:32 PM PDT. (DBC-67111) |
Other Roads Both Directions |
Beach Ave, in both directions. Construction work between Flume Rd and Park Rd. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:41 PM PDT. (DBC-67113) |
Other Roads Both Directions |
Day Rd, in both directions. Construction work between Lockyer Rd and End of Day Rd East. Until Sat Nov 30. From 7:00 AM to 9:00 PM PDT daily. Expect delays. For road construction and culvert replacement. Last updated Mon Aug 12 at 4:40 PM PDT. (DBC-67114) |
Other Roads Westbound |
University Blvd., westbound. Maintenance between Western Parkway and Wesbrook Mall in Vancouver. Until Thu Jan 30, 2025. Shoring work on the south face of Menno Hall along University Blvd. Last updated Sun Sep 1 at 8:44 PM PDT. (DBC-67270) |
Other Roads Both Directions |
Sylvester Rd, in both directions. Road maintenance work at Lundgren Rd. Until Mon Sep 30. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Sep 10 at 10:19 AM PDT. (DBC-68089) |
Other Roads Both Directions |
Highway 91 Connector, in both directions. Shoulder maintenance between Highway 91 and Highway 17. Until Fri Nov 1. From 7:00 AM to 5:00 PM PDT daily. Expect intermittent lane / ramp closures and stoppages in both directions. Watch for traffic control. Last updated Mon Sep 16 at 5:09 PM PDT. (DBC-68330) |