Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Sat Apr 26 at 3:00 PM PDT. Last updated Thu Apr 17 at 4:57 PM PDT. (DBC-73930) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Vehicle incident at Second Narrows Bridge (North Vancouver - District). Left lane is blocked. Centre lane blocked. Next update time Sat Apr 19 at 4:00 PM PDT. Last updated Sat Apr 19 at 3:25 PM PDT. (DBC-75562) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri Apr 25 at 9:00 AM PDT. Last updated Fri Apr 11 at 9:07 AM PDT. (DBC-73987) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 8: Cypress Bowl Rd and Exit 10: 21st St for 2.1 km (West Vancouver). Starting Wed Apr 30 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. Shoulder will be closed. EB shoulder closure at 26th St pedestrian overpass & at Exit 8. Prepare to slow down. Last updated Wed Apr 16 at 6:24 PM PDT. (DBC-75485) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 1.6 km (North Vancouver - District to North Vancouver - City). Until Fri Apr 25. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder closed. Last updated Thu Apr 3 at 6:55 PM PDT. (DBC-74896) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 1.6 km (North Vancouver - District to North Vancouver - City). Until Sun Apr 20. From 10:00 PM to 5:00 AM PDT daily. Right lane closed. Shoulder closed. Last updated Thu Apr 3 at 6:58 PM PDT. (DBC-74897) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between 216th St and Exit 73 for 11.4 km (Langley - District). Starting Sat Apr 26 until Sun May 11. From 8:30 PM to 10:30 AM PDT on weekends. Lane Closure. Watch for traffic control personnel. Scheduled overnight construction work. April 26/27, May 2/3, May 3/4, May 9/10 and May 10/11. Last updated Wed Apr 2 at 4:24 PM PDT. (DBC-74816) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance between Bradner Rd and 248 St for 7.2 km (Abbotsford to Langley - District). Until Wed Apr 30 at 5:00 AM PDT. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74743) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance between 248 St and Bradner Rd for 9.4 km (Langley - District to Abbotsford). Until Wed Apr 30 at 5:30 AM PDT. From 9:00 PM to 7:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:29 PM PDT. (DBC-74749) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Exit 170 and Water Ave for 2.3 km (Hope). Starting Tue Apr 22 until Mon Apr 28. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder will be closed. Left turn lane will be closed. Left hand turn lane to Water Ave closed. Left turn accessible via right lane. Last updated Thu Apr 17 at 12:45 PM PDT. (DBC-74932) |
Highway 1 |
Highway 1 (TransCanada Highway). Special event between Old Boston Bar Rd and North Bend Ferry Rd for 1.1 km (26 to 27 km south of Jackass Mountain Summit). Until Tue Apr 29 at 4:00 PM PDT. Single lane alternating traffic. Last updated Thu Apr 17 at 12:52 PM PDT. (DBC-75520) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Johnson Rd and Blue Lake Rd for 42.1 km (10 km south of Jackass Mountain Summit to 13 km north of Yale). From 8:00 AM to 2:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Mon Mar 31 at 7:22 AM PDT. (DBC-74665) |
Highway 10 |
Highway 10. Utility work between Panorama Dr and 152 St (Surrey). Watch for traffic control. Crews will be working east of Highway 10. Last updated Tue Mar 25 at 9:28 AM PDT. (DBC-74419) |
Highway 10 Westbound |
Highway 10, westbound. Construction work between 152 St and Panorama Dr for 0.4 km (Surrey). Until Wed Apr 30. From 9:00 AM to 3:00 PM PDT daily. Right turn lane closed. Shoulder closed. Sidewalk restoration. Watch for traffic control. Last updated Thu Apr 17 at 3:26 PM PDT. (DBC-75533) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278) |
Highway 101 Both Directions |
Highway 101, in both directions. Line painting at Monkey Tree Lane (Sechelt). Until Fri Apr 25. From 7:00 AM to 7:00 PM PDT on weekdays. Utility work. Last updated Tue Apr 8 at 5:44 PM PDT. (DBC-75110) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19. From 8:00 AM to 4:00 PM PST daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Thu Jan 30 at 11:05 AM PST. (DBC-72411) |
Highway 11 Both Directions |
Highway 11, in both directions. Industrial traffic may slow or block regular traffic. Between McClary Ave and Delair Rd (Abbotsford). Until Thu May 8. From 7:00 PM to 6:00 AM PDT on weekends. Watch for traffic control. Construction vehicles will be travelling along the shoulder. No lane closures are planned. Next update time Thu May 8 at 6:00 PM PDT. Last updated Thu Apr 10 at 1:35 PM PDT. (DBC-73478) |
Highway 11 |
Highway 11. Bridge construction between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Fri May 9. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. NB work until May 3: 1 lane closed. Width restriction 3.8m. Loads over 3.8m may not cross until 4:30AM, supervised with 7 days notice. Speed bumps 24hrs/day. Last updated Sat Apr 12 at 1:47 AM PDT. (DBC-74538) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Thu Mar 20 at 9:08 AM PDT. (DBC-74197) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Roadside brushing between 4 Ave and 32 Ave for 5.6 km (Surrey). Until Fri Apr 25 at 3:00 PM PDT. Right lane is blocked. Shoulder closed. Powerline maintenance for BC Hydro. Last updated Thu Apr 10 at 3:19 PM PDT. (DBC-75230) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work planned between 20 Ave and 24 Ave for 0.8 km (Surrey). Starting Tue Apr 22 until Fri Apr 25. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed. Last updated Thu Apr 17 at 1:10 PM PDT. (DBC-75524) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work between 32 Ave and 40 Ave for 1.6 km (Surrey). Until Mon May 12. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Thu Mar 13 at 3:24 PM PDT. (DBC-73932) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 14 at 11:23 AM PDT. (DBC-75355) |
Highway 17 Eastbound |
Highway 17, eastbound. Maintenance planned between Highway 91 Connector and Grace Rd for 0.8 km (Delta). Starting Mon Apr 21 at 8:00 AM PDT until Mon Apr 21 at 3:00 PM PDT. Lane Closure. Expect delays. Last updated Thu Apr 17 at 2:02 PM PDT. (DBC-75527) |
Highway 3 |
Highway 3 (Crowsnest Highway). Industrial traffic may slow or block regular traffic. Between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 1.2 km (4 to 3 km east of Hope). Starting Tue Apr 22 at 7:00 AM PDT until Thu Apr 24 at 7:00 PM PDT. Right lane will be blocked. Right lane closure from Mt. Hope Forest Service Rd. To Highway 3/5 split for hauling from the quarry. Last updated Thu Apr 17 at 4:25 PM PDT. (DBC-75536) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Tue Apr 1 at 8:41 AM PDT. (DBC-74724) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Road maintenance work planned between Allison Pass Summit and Second Avalanche Gate for 15.2 km (54 to 39 km east of Hope). Starting Wed Apr 23 at 9:00 AM PDT until Wed Apr 23 at 5:00 PM PDT. Spill clean up. Watch for crews working on the shoulder. Last updated Tue Apr 15 at 2:46 PM PDT. (DBC-75424) |
Highway 3 |
Highway 3 (Crowsnest Highway). Utility work between Allison Pass Summit and Manning Park Resort (58 km east of Hope). Until Thu May 15 at 4:30 PM PDT. Lane Closure. Hydro Pole replacement from Gibson Pass Rd. To Manning Park. Last updated Tue Apr 15 at 2:51 PM PDT. (DBC-75425) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. There is a wildfire at Manning Park Resort (64 km east of Hope). Right lane closed. Please slow down and watch for emergency and road crews. Next update time Sun Apr 20 at 2:00 PM PDT. Last updated Sat Apr 19 at 4:07 PM PDT. (DBC-75564) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Vehicle recovery planned at Exit 202: Portia (11 km south of Great Bear Snowshed). Starting Tue Apr 22 at 9:00 AM PDT until Tue Apr 22 at 4:00 PM PDT. Exit closed for vehicle incident clean up. Last updated Thu Apr 17 at 12:43 PM PDT. (DBC-75517) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Bridge maintenance planned between Schoolhouse St and Colony Farm Rd for 0.4 km (Coquitlam). Starting Mon Apr 21 at 11:00 PM PDT until Tue Apr 22 at 5:00 AM PDT. Right lane will be closed. Shoulder will be closed. Slow Lane Closed for Highway 7 Eastbound closed at United Boulevard Off Ramp
Shoulder Closed for United Boulevard On Ramp to Hwy 7 Eastbound. Last updated Thu Apr 17 at 2:50 PM PDT. (DBC-75532) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work planned between 203 St and 207 St for 0.7 km (Maple Ridge). Starting Mon Apr 21 at 9:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. Lane Closure. Last updated Wed Apr 2 at 2:13 PM PDT. (DBC-74809) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work planned between Laity St and 216 St for 0.4 km (Maple Ridge). Starting Tue Apr 29 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Right lane will be closed. Shoulder will be closed. Last updated Fri Apr 11 at 11:33 AM PDT. (DBC-75275) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 22-26, April 28-May 3. WB right turn to 272nd closed. Detour at 263rd. Construction speed limit 50km/hr. River Rd single lane alternating as needed. Next update time Sat Apr 26 at 6:00 PM PDT. Last updated Thu Apr 17 at 6:06 PM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.0 km (2 to 4 km east of Mission). Until Wed Apr 30. From 9:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Mar 31 at 9:20 AM PDT. (DBC-74678) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. Watch for traffic control. Last updated Fri Mar 28 at 4:12 PM PDT. (DBC-74614) |
Highway 7 |
Highway 7 (Lougheed Highway). Road sweeping between Harrison Bay Rd and Kennedy Rd for 5.7 km (Kent). Single lane alternating traffic. Sweeping taking place on Highway 7 from Harrison Bay store to Sasquatch in then to Morris Valley rd. Please watch for slow moving vehicles. Last updated Wed Mar 26 at 8:07 AM PDT. (DBC-74465) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road sweeping between Scowlitz Access Rd and Highlands Blvd for 8.6 km (Kent). Single lane alternating traffic. Expect delays. Watch for traffic control and sweeper working. Last updated Tue Mar 25 at 7:05 AM PDT. (DBC-74407) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Bridge maintenance between Seabird Island Rd and Ruby Creek Rd for 15.0 km (Kent). Lane Closure. Watch for traffic control. Last updated Tue Mar 25 at 7:23 AM PDT. (DBC-74408) |
Highway 7B Eastbound |
Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617) |
Highway 91 |
Highway 91. Road maintenance work at Highway 91 Connector. Until Fri Apr 25. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder maintenance. Last updated Fri Apr 11 at 3:28 PM PDT. (DBC-75295) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance planned between Exit 11: Westminster Hwy and Nordel Crt for 3.2 km (Delta to Richmond). Starting Mon Apr 21 at 10:00 PM PDT until Fri Apr 25 at 4:30 AM PDT. From 10:00 PM to 4:30 AM PDT on weekdays. Right lane will be closed. Centre lane will be closed. Last updated Thu Apr 17 at 2:26 PM PDT. (DBC-75529) |
Highway 91 Both Directions |
Highway 91, in both directions. Construction work planned at Exit 8: Nordel Way (Delta). Starting Tue Apr 22 at 7:00 AM PDT until Fri Apr 25 at 5:00 PM PDT. Lane closures in both directions planned. Work on north and south bridge span of Hwy 91 overpass. Concrete finishing repair. Last updated Wed Apr 16 at 2:56 PM PDT. (DBC-75474) |
Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT on weekdays. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Last updated Sun Mar 30 at 8:40 AM PDT. (DBC-74159) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between W Pender St and Lions Gate Bridge for 3.3 km (West Vancouver to Vancouver). Starting Sun Apr 27 at 7:00 AM PDT until Sun Apr 27 at 11:30 AM PDT. Expect delays due to congestion. Lane Closure. VancouverSunRun.Com for additional information. Last updated Mon Mar 17 at 10:21 AM PDT. (DBC-74046) |
Highway 99 Northbound |
Highway 99, northbound. Electrical maintenance between Scott Cres and Cleveland Ave (Squamish). Until Fri May 2. Right turn lane closed. Shoulder closed. Next update time Fri May 2 at 6:00 AM PDT. Last updated Fri Mar 28 at 1:34 PM PDT. (DBC-74602) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Scott Cres and Cleveland Ave (Squamish). Starting Fri May 2 until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane will be closed. Shoulder will be closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping planned between Exit 3: Horseshoe Bay Junction and Spring Creek Dr for 94.3 km (Whistler to West Vancouver). Starting Tue Apr 22 until Fri Apr 25. From 7:30 AM to 5:30 PM PDT daily. Shoulder will be closed. Watch for slow moving vehicles. Last updated Thu Apr 17 at 1:24 PM PDT. (DBC-75525) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Morris Valley Rd Both Directions |
Morris Valley Rd, in both directions. Construction work at Chehalis Rd. Until Thu Apr 24. From 6:00 AM to 7:00 PM PDT daily. Intermittent single lane alternating traffic. Lane shift and speed reduction 24/7. Last updated Mon Mar 17 at 1:40 PM PDT. (DBC-73186) |
Other Roads Eastbound |
Dollarton Highway, eastbound. Utility work between Highway 1 and Dollarton Bridge in North Vancouver - City. Until Wed Apr 30. From 7:00 AM to 8:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Wed Mar 12 at 1:42 PM PDT. (DBC-72344) |
Other Roads Both Directions |
Othello Road, in both directions. Construction work between Tunnels Road and Highway 5 (Exit 183). Until Fri May 2. From 6:00 AM to 7:00 PM PDT daily. Expect delays. Othello Road MoTT Project. Last updated Thu Mar 20 at 3:18 PM PDT. (DBC-74227) |
Other Roads Both Directions |
56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742) |
Other Roads Both Directions |
264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747) |
Other Roads Eastbound |
Mountain Hwy, eastbound. Utility work planned between Highway 1 and Arborlynn Dr. Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 3:00 PM PDT. Last updated Thu Apr 3 at 5:44 PM PDT. (DBC-74892) |
Other Roads Westbound |
NW Marine Drive, westbound. Maintenance planned between 4900 Block and Spanish Banks West Parking Lot A in Vancouver. Starting Mon Apr 28 until Fri May 2. From 7:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Thu Apr 10 at 5:07 PM PDT. (DBC-75235) |