Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 60km/h zone until Aug 16. 80km/h outside construction hours. Watch for traffic control. Next update time Sat Aug 16 at 10:00 AM PDT. Last updated Mon Jul 21 at 6:52 AM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PDT. Last updated Mon Jun 16 at 6:28 AM PDT. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Mon Sep 15. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. 20 minute closure at 7:00pm at Kault Hill for blasting. Next update time Mon Sep 15 at 9:00 AM PDT. Last updated Sun Jul 20 at 6:37 AM PDT. (DBC-72305) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 8:00 PM to 6:00 AM PDT on weekdays and Saturday. Single lane alternating traffic. Next update time Wed Jul 30 at 12:00 PM PDT. Last updated Wed Jul 23 at 11:25 AM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Paving operations planned between Ford Rd and Bolton Rd for 4.5 km (Tappen). Starting Thu Jul 24 until Sat Jul 26. From 7:00 PM to 6:00 AM PDT on Thursday and Friday. Single lane alternating traffic will be in effect. Last updated Mon Jul 21 at 6:59 PM PDT. (DBC-79544) |
Highway 1 |
Highway 1 (TransCanada Highway). Geotechnical investigation planned between Bernie Rd and Malakwa Rd for 30.0 km (Sicamous). Starting Wed Jul 23 at 9:00 PM PDT until Sun Jul 27 at 5:00 AM PDT. Expect minor delays. Night time construction work planned. Last updated Fri Jul 11 at 11:49 AM PDT. (DBC-79118) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. There is debris on the road between Bernie Rd and Perry River Bridge for 38.8 km (Sicamous). Watch for tree debris on road. Last updated Mon Jul 21 at 4:28 PM PDT. (DBC-79361) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Sunday Summit and Copper Mountain Rd for 34.2 km (Princeton). Until Sat Oct 4 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays of up to 20 minutes. Last updated Wed Jul 2 at 10:57 AM PDT. (DBC-78739) |
Highway 33 Southbound |
Highway 33, southbound. Construction work between Rutland Rd and Prior Rd S for 0.2 km (Kelowna). Until Thu Jul 31 at 6:00 AM PDT. Centre lane is closed in both directions. Utility work. Last updated Thu Jul 10 at 8:49 AM PDT. (DBC-79052) |
Highway 97 Southbound |
Highway 97, southbound. Road construction work between Sandhill Rd and Pineview Dr (1 km south of Penticton). Until Fri Oct 24. Lane Closure. Shoulder closed. Industrial traffic may slow or block regular traffic. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Tue Jan 14 at 9:05 PM PST. (DBC-71783) |
Highway 97 Southbound |
Highway 97, southbound. Paving operations between William R Bennett Bridge and Nancee Way for 2.9 km (1 km north of West Kelowna to Kelowna). Until Fri Jul 25. From 8:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Expect delays. Width restriction of 4.0m wide through the worksite 8pm-6am. Oversize loads please contact traffic control personal onsite 604-855-5672 the evening prior to your arrival. Last updated Thu Jul 17 at 12:08 PM PDT. (DBC-77335) |
Highway 97 Southbound |
Highway 97, southbound. Bridge maintenance between Abbott St and William R Bennett Bridge (Kelowna). Until Thu Jul 24 at 5:00 AM PDT. Night time construction work. Wide Loads Use Caution and call ahead: 250-469-0330. Last updated Mon Jul 21 at 12:01 PM PDT. (DBC-79021) |
Highway 97 |
Highway 97. Crack sealing is underway between Hanna Rd and Monte Creek for 4.7 km (3 to 8 km east of Monte Creek). Until Mon Jul 28. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane Closure. Expect delays up to 15 minutes. Last updated Tue Jul 22 at 8:59 PM PDT. (DBC-79603) |
Highway 97A |
Highway 97A. There is debris on the road between Salts Rd and Sicamous Creek Frtg for 29.0 km (5 km north of Enderby to Sicamous). Watch for tree debris on road. Last updated Mon Jul 21 at 4:28 PM PDT. (DBC-79362) |
Other Roads Both Directions |
Riverside Rd, in both directions. Roadway obstruction between 233 Riverside Rd and 136 Riverside Rd. Road closed. Sinkhole blocking both lanes. All properties are accessible on either side of the closure. Next update time Thu Aug 7 at 11:00 AM PDT. Last updated Wed Jul 23 at 4:26 PM PDT. (DBC-75092) |
Other Roads |
Newton Dr. Bridge maintenance between Sparton Dr and Duchess Dr. Until Thu Jul 31. From 9:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Road closed. Closed to all traffic during working hours, reopen outside of working hours. Last updated Tue Jun 17 at 11:36 AM PDT. (DBC-78125) |
Other Roads |
Rosemond Lake Rd. Bridge maintenance between Riverside Rd and Coell Jones Rd. Until Thu Jul 31. From 8:00 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Road closed. Road closed to all traffic except emergency vehicles. Pedestrian crossing at 12pm- 12:30pm. Last updated Wed Jun 18 at 8:44 AM PDT. (DBC-78175) |
Other Roads Northbound |
Upper Bench Rd, northbound. Shoulder maintenance planned between Highway 3A and Middle Bench Rd in Keremeos. Starting Mon Jul 28 until Fri Aug 1. From 7:00 AM to 4:00 PM PDT on weekdays. Watch for traffic control personnel. Shoulder will be closed. Work will occur for 8 hours on one day of the week above - to be determined by crews. Last updated Wed Jul 16 at 12:33 PM PDT. (DBC-79330) |
Other Roads Eastbound |
Old Hedley Rd, eastbound. Road maintenance work planned between Highway 3 and Bromley Rock 10 km west of Hedley. Starting Mon Aug 11 until Fri Aug 15. From 7:00 AM to 4:00 PM PDT on weekdays. Eastbound lane will be closed. Single lane alternating traffic will be in effect. Last updated Tue Jul 22 at 10:26 AM PDT. (DBC-79575) |