Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Watch for traffic control. Expect delays. Speed reduced to 30 km/h. Highway stoppages with expected delays of 15 minutes. Project completion: 30 November 2024. Next update time Tue Oct 15 at 3:00 PM PDT. Last updated Fri Sep 27 at 5:14 PM PDT. (DBC-56391) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Maintenance between Exit 202: Portia and Exit 217: Zopkios Brake Check (1 km north of Great Bear Snowshed). Until Mon Sep 30. Roadway reduced to one lane. Expect delays. Planned Maintenance on Snowshed Tunnel with a 4.3meter width restriction in place. No loads over 4.3 meters. Obey signage. Next update time Mon Sep 30 at 5:00 PM PDT. Last updated Thu Sep 12 at 1:34 PM PDT. (DBC-68200) |
Other Roads |
Clearwater Station Bridge. Bridge maintenance planned at Clearwater Station Road. Starting Tue Oct 8 until Tue Oct 22. Road closure planned. Detour planned. Detour via Dunn Lake Rd. Pedestrian access will be maintained and Little Fort Ferry will remain open. Next update time Tue Oct 22. Last updated Mon Sep 16 at 3:31 PM PDT. (DBC-68323) |
Other Roads |
Red Bridge. Bridge closed between Athabasca Street and Lorne Street 1 km north of Kamloops. Bridge damaged. Detour in effect. Detour via Highway 5. Next update time Fri Oct 25 at 8:00 AM PDT. Last updated Wed Sep 25 at 10:40 PM PDT. (DBC-68412) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock scaling between Gladwin Rd and Nicomen River Rd (10 km east of Lytton). Until Mon Oct 28. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Mon Sep 9 at 11:46 AM PDT. (DBC-67889) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Beaton Rd and Greenstone Rd for 1.7 km (7 to 9 km west of Kamloops). Starting Tue Oct 1 until Fri Oct 4. From 9:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Mon Sep 23 at 10:07 AM PDT. (DBC-68517) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Bridge maintenance at Exit 238: Juliet Rd (19 km north of Coquihalla Summit). Until Fri Oct 4. Expect delays. Road will be reduced to single lane counterflow traffic September 3 to October 4 24 hours a day. Please slow down through work zone and obey signage. Width restrictions in place, please contact permit Center. Last updated Wed Sep 4 at 10:03 PM PDT. (DBC-67845) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work planned between Palmer-Forsyth Rd and Old Hwy 5 (Kamloops). Starting Tue Oct 1 at 12:00 PM PDT until Tue Oct 1 at 5:00 PM PDT. Lane Closure. Expect minor delays. Last updated Thu Sep 26 at 2:23 PM PDT. (DBC-68661) |
Highway 5 |
Highway 5. Construction work planned between Palmer-Forsyth Rd and Old Hwy 5 (Kamloops). Starting Wed Oct 2 at 7:00 AM PDT until Sat Oct 5 at 5:00 PM PDT. Lane Closure. Expect minor delays. Last updated Thu Sep 26 at 2:26 PM PDT. (DBC-68662) |
Highway 5 Both Directions |
Highway 5, in both directions. Construction work between Carilla Rd and Clough Rd for 3.7 km (11 to 7 km south of Barriere). Lane closures in both directions in effect. No lane closures on Sunday. Reduced speed 24 hours per day. Next update time Sat Oct 19 at 11:00 AM PDT. Last updated Fri Sep 20 at 10:43 AM PDT. (DBC-66432) |
Highway 5 Southbound |
Highway 5, southbound. Tree pruning between Clearwater Valley Rd and Field Rd for 27.0 km (2 km north of Little Fort to Clearwater). Until Fri Oct 18. From 7:00 AM to 5:00 PM PDT daily. Lane closures in both directions in effect. Single lane alternating traffic. Watch for traffic control. Last updated Mon Sep 23 at 1:34 PM PDT. (DBC-68530) |
Highway 5 Both Directions |
Highway 5, in both directions. Utility work between Vavenby Bridge Rd and Skinner Rd for 14.5 km (Vavenby). Until Thu Oct 10. From 7:00 AM to 4:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Wed Sep 18 at 3:21 PM PDT. (DBC-68403) |
Highway 5A |
Highway 5A. Watch for falling rocks between the start of Highway 5A and Gulliford Lake Rest Area for 37.5 km (2 km south of Gulliford Lake Rest Area to Princeton). Last updated Fri Sep 27 at 10:42 PM PDT. (DBC-58676) |
Highway 5A |
Highway 5A. Utility work planned between Roche Lake Rd and Campbell Creek Rd (15 km south of Kamloops). Starting Wed Oct 2 at 9:00 AM PDT until Wed Oct 2 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Fri Sep 27 at 9:13 AM PDT. (DBC-68688) |
Highway 97C Westbound |
Highway 97C (Okanagan Connector), westbound. Utility work planned at Aspen Grove (22 km east of Merritt). Starting Wed Oct 16 at 9:00 AM PDT until Wed Oct 16 at 4:00 PM PDT. Right lane will be closed. For power pole replacement. Last updated Mon Sep 23 at 11:06 AM PDT. (DBC-68523) |