Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd for 1.1 km (10 to 11 km east of Lytton). Single lane alternating traffic. Work will take place from 6:00am-4:30pm PT daily. Expect up to 40 minute delays due to railway crossing / construction activities. Next update time Mon Sep 15 at 10:00 AM PDT. Last updated Tue Aug 19 at 12:24 AM PDT. (DBC-75637) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work planned between Gladwin Rd and Nicomen River Rd (11 km east of Lytton). Starting Sun Sep 14 at 11:00 PM PDT until Mon Sep 15 at 7:00 AM PDT. Road closure planned. Next update time Mon Sep 15 at 7:00 AM PDT. Last updated Wed Sep 10 at 8:09 AM PDT. (DBC-81393) |
Highway 5 |
Highway 5 (Coquihalla South). Travel advisory in effect between Exit 231: Mine Creek Rd and Exit 250: Larson Hill for 18.6 km (12 to 31 km north of Coquihalla Summit). Wildfire activity. Limited visibility with smoke (Hope-Merritt)No stopping. Intermittent lane closures and stoppages. Speed reduction in place, slow down. Next update time Fri Sep 12 at 12:00 PM PDT. Last updated Wed Sep 10 at 12:41 PM PDT. (DBC-81233) |
Lytton Ferry |
Lytton Ferry. There will be required maintenance between Lytton Ferry Start and Lytton Ferry End (Lytton). Starting Thu Sep 18 at 9:30 AM PDT until Thu Sep 18 at 2:30 PM PDT. Ferry route will be closed. Next update time Thu Sep 18 at 2:30 PM PDT. Last updated Thu Sep 11 at 11:40 AM PDT. (DBC-81459) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Tree pruning between Holman Rd and Miners Bluff Rd for 18.3 km (Kamloops). Until Sat Sep 13. From 8:00 AM to 4:00 PM PDT daily. Right lane closed. Watch for traffic control. Last updated Fri Aug 29 at 1:09 PM PDT. (DBC-81025) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Left lane is closed in both directions. 24/7 barrier work. Please obey signage and slow down for workers. RCMP-enforced speed reduction. Next update time Mon Sep 15 at 12:00 PM PDT. Last updated Wed Aug 20 at 12:16 PM PDT. (DBC-79196) |
Highway 5 Both Directions |
Highway 5 (Coquihalla South), in both directions. Paving operations between Exit 221: Falls Lake Rd and Exit 231: Mine Creek Rd for 6.3 km (3 to 10 km north of Coquihalla Summit). Until Tue Sep 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Lane closures in both directions in effect. Watch for traffic control. Dry Gulch Bridge to Henning Bridge. Delays up to 15 minutes for paving. Last updated Mon Jul 21 at 9:19 AM PDT. (DBC-79513) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 12.8 km (Merritt). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:23 AM PDT. (DBC-78512) |
Highway 5 Both Directions |
Highway 5 (Coquihalla North), in both directions. Line painting between Exit 286: Merritt - 97C and Exit 336: Walloper Interchange for 23.2 km (2 km north of Merritt to 5 km south of Surrey Lake Summit). Until Sun Sep 14. From 7:00 PM to 6:00 AM PDT daily. Lane Closure. Speed reduction to 70km/hr. Watch for crews. Last updated Thu Sep 11 at 3:11 PM PDT. (DBC-81375) |
Highway 5 |
Highway 5 (Coquihalla North). Construction work between Exit 315: Helmer Rd and Exit 336: Walloper Interchange for 20.7 km (Surrey Lake Summit). Until Tue Sep 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control. Last updated Wed Jun 25 at 9:28 AM PDT. (DBC-78513) |
Highway 5A Southbound |
Highway 5A, southbound. Vehicle recovery planned between Separation Rd and Campbell Creek Rd for 3.5 km (7 to 10 km south of Kamloops). Starting Fri Sep 12 at 7:00 AM PDT until Fri Sep 12 at 8:00 PM PDT. Lane Closure. Last updated Thu Sep 11 at 3:44 PM PDT. (DBC-81456) |
Highway 8 Both Directions |
Highway 8, in both directions. Construction work between Start of Highway 8 and Porcupine Ridge Rd 6 km east of Spences Bridge. Until Sat Nov 15. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 16, 17, 18, 19. Last updated Tue Aug 26 at 5:25 PM PDT. (DBC-80660) |
Highway 8 |
Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Thu Sep 11 at 11:03 AM PDT. (DBC-72877) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 2.6 km (Spences Bridge). Until Fri Sep 12 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 20/21. Last updated Sat Sep 6 at 9:15 PM PDT. (DBC-79173) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 0.3 km (Spences Bridge). Until Mon Sep 22 at 5:00 PM PDT. Site 22. Single lane alternating traffic will be in effect 24 hrs. Watch for traffic control personnel and obey traffic signals. Expect delays of 5 to 30-min closures between 7AM to 5PM. Last updated Wed Sep 10 at 9:06 AM PDT. (DBC-80709) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and Porcupine Ridge Rd for 3.3 km (5 to 8 km east of Spences Bridge). Until Sun Sep 14 at 4:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Site 12 to 15. Last updated Sat Sep 6 at 9:09 PM PDT. (DBC-80708) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.7 km (9 to 12 km east of Spences Bridge). Until Fri Nov 28. Single lane alternating traffic. SITE 9/10. 30-min closures between 10am and 2pm daily. Traffic flushed between closures. Emergency vehicles accommodated. Next update time Fri Nov 28 at 9:00 AM PDT. Last updated Mon Sep 8 at 8:00 AM PDT. (DBC-74796) |
Other Roads Both Directions |
Shuswap Road, in both directions. Construction work between Sun Rivers Drive and Harper Ranch Pinantan near Kamloops. Until Tue Sep 30 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon Jul 28 at 3:37 PM PDT. (DBC-79824) |
Other Roads |
Iron Mtn Road. Road construction work between Start and 3K. Until Thu Sep 10, 2026. From 7:00 AM to 3:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Expect minor delays. Last updated Wed Sep 3 at 6:07 AM PDT. (DBC-80398) |
Other Roads Both Directions |
Rey Lake Road, in both directions. Utility work between Highway 97C and End of Road. Until Fri Oct 31 at 7:00 AM PDT. Road closed. Full closure for powerline upgrades to Highland Valley Mine. Last updated Fri Sep 5 at 10:24 AM PDT. (DBC-81166) |