Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Full road closures between 10am-2pm, 7 days per week. Single lane alternating traffic will be in place outside of these hours. Limited closures of up to 15 mins through Easter Long Weekend. No full closures between April 18th to 21st. Next update time Mon Apr 21 at 2:30 PM PDT. Last updated Wed Apr 16 at 4:31 PM PDT. (DBC-61149) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road sweeping between Butterfield Rd and Trunk Rd for 21.4 km (Mill Bay to Duncan). From 7:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Lane Closure. Watch for traffic control. Road sweeping in effect, alternating lanes will be closed, please watch for traffic control. Last updated Mon Mar 24 at 10:14 AM PDT. (DBC-74347) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Frayne Rd and Butterfield Rd for 1.7 km (Mill Bay). Starting Wed Apr 23 at 9:00 AM PDT until Wed Apr 23 at 3:00 PM PDT. Right lane will be closed. Last updated Wed Apr 2 at 1:33 PM PDT. (DBC-74808) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Whippletree Frtg and Bench Rd for 0.8 km (2 to 3 km north of Cobble Hill). Starting Thu May 1 at 9:00 AM PDT until Thu May 1 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Mon Apr 7 at 2:31 PM PDT. (DBC-75034) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Trunk Rd and York Rd for 0.6 km (Duncan). Starting Tue May 20 until Sat Jun 14. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Thu Apr 3 at 2:48 PM PDT. (DBC-74880) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Davis Rd and Cedar Rd for 20.8 km (Nanaimo to Ladysmith). Starting Tue Apr 22 at 4:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. From 4:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed in both directions. Watch for traffic control personnel. Last updated Thu Apr 17 at 12:50 PM PDT. (DBC-75519) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Tuesday Apr 1 right lane closure closure 9am-5pm. Watch for work crews. Last updated Thu Mar 27 at 5:52 PM PDT. (DBC-70846) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Croce Rd and Maple Ave S for 1.4 km (Sooke). Until Fri May 2. From 12:00 AM to 5:00 AM PDT daily. Shoulder maintenance. Last updated Tue Apr 1 at 10:09 AM PDT. (DBC-74727) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Murray Rd and Anna Marie Rd for 0.3 km (Sooke). Until Sat Apr 26. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Last updated Mon Apr 14 at 12:55 PM PDT. (DBC-75361) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31. Lane Closure. Watch for traffic control. Last updated Fri Apr 11 at 1:38 PM PDT. (DBC-75277) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Lazzar Rd and Woodlands Rd for 1.7 km (Sooke). Until Fri May 9. From 9:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Wed Apr 2 at 1:03 PM PDT. (DBC-74804) |
Highway 17 Southbound |
Highway 17 (Patricia Bay Highway), southbound. Special event planned between Lands End Rd and Exit 31 (North Saanich). Starting Wed Jul 23 at 6:00 PM PDT until Wed Jul 23 at 7:30 PM PDT. Victoria Wheelers Cycling Club Bike Race - watch for cyclists at Wain Rd off ramp. Last updated Tue Mar 25 at 9:50 AM PDT. (DBC-74423) |
Highway 19 |
Highway 19 (Island Highway). Utility work planned between Island Hwy and Byng Rd for 1.1 km (Port Hardy). Starting Thu Apr 24 at 9:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. Westbound on Douglas St, Right Turn Lane Closure, between Byng Rd and Bear Cove Hwy.
-
Eastbound on Douglas Dt, Lane shift, between Goodspeed Rd and Bear Cove Hwy. Last updated Wed Apr 16 at 3:51 PM PDT. (DBC-75478) |
Highway 19 |
Highway 19 (Island Highway). Tree pruning between Eagles Nest Rest Area and Englewood Dr for 5.8 km (Woss). Until Tue Apr 22 at 4:00 PM PDT. BC Hydro Vegetation Maintenance. Last updated Tue Apr 8 at 3:31 PM PDT. (DBC-75104) |
Highway 19 Northbound |
Highway 19 (Island Highway), northbound. Utility work between Big Tree Creek Rest Area and Mountview Dr for 13.0 km (34 to 47 km north of Campbell River). BC Hydro Pole replacement. Last updated Mon Feb 10 at 9:51 AM PST. (DBC-72724) |
Highway 19 |
Highway 19 (Inland Island Highway). Electrical maintenance planned at Parksville Exit (Highway 19A) (1 km south of Parksville). Starting Wed Apr 23 at 8:30 AM PDT until Wed Apr 23 at 11:30 AM PDT. Shoulder will be closed. Watch for traffic control personnel. Last updated Fri Apr 4 at 9:56 AM PDT. (DBC-74913) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Bridge maintenance planned between Church Rd and Cranberry Ave for 43.5 km (Nanaimo to 1 km north of Parksville). Starting Tue Apr 22 at 4:00 AM PDT until Fri May 2 at 3:00 PM PDT. From 4:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed in both directions. Watch for traffic control personnel. Last updated Thu Apr 17 at 12:44 PM PDT. (DBC-75518) |
Highway 19A |
Highway 19A (Island Highway). Electrical maintenance planned between Exit 46 and Franklin's Gull Rd (Parksville). Starting Wed Apr 23 at 11:30 AM PDT until Wed Apr 23 at 2:30 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Last updated Fri Apr 4 at 10:02 AM PDT. (DBC-74915) |
Highway 19A |
Highway 19A (Island Highway). Tree pruning between Buckley Bay Rd and Royston Rd for 15.8 km (Buckley Bay Ferry Terminal to 2 km south of Courtenay). Until Fri May 2 at 4:00 PM PST. Single lane alternating traffic. Tree maintenance around BC Hydro poles/lines Mon-Fri 9-3. Last updated Mon Jan 27 at 10:19 AM PST. (DBC-72227) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Finlay Rd and Catherwood Rd for 0.8 km (12 to 13 km south of Campbell River). Starting Tue Apr 22 at 9:00 AM PDT until Wed Apr 23 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Aerial placing on existing poles. Last updated Thu Apr 10 at 11:31 AM PDT. (DBC-75209) |
Highway 19A |
Highway 19A (Island Highway). Construction work planned between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Starting Wed Jun 4 at 7:00 AM PDT until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |
Highway 28 |
Highway 28. Utility work between Gold River Hwy and Western Mine Rd for 39.7 km (Gold River to 37 km west of Campbell River). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Minor Delays, Fibre Optic Conduit Placement. Last updated Thu Mar 13 at 2:23 PM PDT. (DBC-73923) |
Highway 28 Both Directions |
Highway 28, in both directions. Bridge maintenance at Western Mine Rd (37 km west of Campbell River). Until Fri May 30 at 7:30 PM PDT. From 7:30 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Active working hours 7:30am to 6:00pm. This is a 24hr 7 day a week operation at Buttle Narrows. Last updated Mon Mar 24 at 12:32 PM PDT. (DBC-74354) |
Highway 30 |
Highway 30. Utility work between Marble River Rest Area and South Hardy Mainline for 2.0 km (14 to 16 km north of Port Alice). Until Thu May 1 at 7:00 PM PDT. Single lane alternating traffic. Underground Utility Locates & Geophysical Survey Excluding Weekends. Last updated Thu Feb 20 at 9:34 AM PDT. (DBC-73032) |
Highway 4 Both Directions |
Highway 4, in both directions. Utility work planned between Sproat Lake Viewpoint and Bingo Bay for 0.2 km (19 km west of Port Alberni to 19 km east of Sutton Pass Summit). Starting Mon Apr 28 at 9:00 AM PDT until Fri May 2 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility work - BC Hydro pole transfer - watch for work crews. Last updated Tue Apr 15 at 12:41 PM PDT. (DBC-74729) |
Highway 4 Both Directions |
Highway 4, in both directions. Construction work between Elizabeth St and Helen St for 0.2 km (Port Alberni). Until Thu May 1 at 5:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - watch for work crews. Last updated Wed Apr 2 at 9:48 AM PDT. (DBC-74413) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Fri Aug 1 at 10:00 AM PDT. Last updated Wed Apr 2 at 10:13 AM PDT. (DBC-52953) |
Highway 4 Eastbound |
Highway 4, eastbound. Construction work planned between Epron Rd and Redman Rd for 0.1 km (8 km west of Qualicum Beach). Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 12:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Watch for speed reduction and work crews. Last updated Thu Apr 17 at 1:05 PM PDT. (DBC-75523) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work planned between Burbank Rd and Hilliers Rd S for 0.1 km (5 km west of Qualicum Beach). Starting Tue Apr 29 at 1:00 PM PDT until Tue Apr 29 at 5:00 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Utility Work - BC HYDRO pole maintenance- watch for work crews. Last updated Mon Apr 7 at 1:39 PM PDT. (DBC-75031) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work planned between McLean Rd and Rupert Rd W for 0.4 km (1 km west of Qualicum Beach). Starting Thu May 1 at 9:00 AM PDT until Thu May 1 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility work - BC Hydro Pole replacement. Watch for speed reduction and work crews. Last updated Tue Apr 8 at 8:51 AM PDT. (DBC-75074) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. No work April 18th to April 20th. Next update time Mon Jun 30 at 9:00 AM PDT. Last updated Sat Mar 29 at 9:29 AM PDT. (DBC-68621) |
Other Roads Both Directions |
Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Night Work from 8:00pm to 5:30am, Construction work between Highway 1 and Highway 17 near Victoria. Expect delays and traffic interruptions on Hwy 1, Hwy 17, Ravine Way and Carey Rd both directions. Construction zone in effect 24/7. Last updated Fri Mar 21 at 1:10 PM PDT. (DBC-71339) |
Other Roads Both Directions |
Fairbanks Rd, in both directions. Utility work between 1110 Fairbanks Rd and 1108 Fairbanks Rd. Until Sat May 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility Work - Pipe installation. Watch for work crews. Last updated Tue Apr 15 at 4:20 PM PDT. (DBC-73197) |
Other Roads Both Directions |
Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. WATERMAIN INSTALL - Watch for work crews. Last updated Tue Mar 18 at 11:57 AM PDT. (DBC-73760) |
Other Roads Eastbound |
Long Harbour Rd, eastbound. Utility work planned between Welbury Dr and Ferry Terminal in Salt Spring Island. Starting Tue Apr 22 until Fri May 16. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Tue Apr 1 at 12:36 PM PDT. (DBC-74731) |
Other Roads |
Hardy Bay Rd. Special event planned between Market St and Coal Harbour Rd 1 km north of Port Hardy. Starting Sun Jun 1 at 7:00 AM PDT until Sun Jun 1 at 2:00 PM PDT. Hardy Hussle June 1 7am to 2pm. Last updated Tue Apr 8 at 3:23 PM PDT. (DBC-75103) |
Other Roads |
Canal Road . Bridge maintenance between Wallace Road and Ainslei Point road. From 7:00 AM to 5:00 PM PDT daily. Expect minor delays. Last updated Thu Apr 10 at 12:11 PM PDT. (DBC-75212) |
Other Roads Both Directions |
Fisher Rd, in both directions. Special event planned between Holland Ave and Watson Ave. Starting Sat Aug 23 at 7:00 AM PDT until Sat Aug 23 at 5:00 PM PDT. Road closure planned. Cobble Hill Fair. Last updated Mon Apr 14 at 9:51 AM PDT. (DBC-75349) |
Other Roads Both Directions |
Jingle Pot rd, in both directions. Special event planned between Doumont Rd. And Maxey Rd. Starting Sun May 11 at 7:30 AM PDT until Sun May 11 at 11:00 AM PDT. SPECIAL EVENT - WESTWOOD LAKE TRIATHALON. Watch for cyclists on shoulder. Last updated Wed Apr 16 at 3:46 PM PDT. (DBC-75477) |