Barnston Island Ferry Both Directions |
Barnston Island Ferry, in both directions. Travel advisory in effect between Barnston Island Ferry and the end of Barnston Island Ferry (1 km east of Surrey). Delays expected for GVW over 4,600kg at low water levels. Contact ferry operator to plan travel accordingly. Next update time Sat Apr 26 at 3:00 PM PDT. Last updated Thu Apr 17 at 4:57 PM PDT. (DBC-73930) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Road cleared between Exit 27: E 1st Ave and Cassiar Conn (Vancouver). Last updated Sat Apr 19 at 1:25 PM PDT. (DBC-75561) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Vehicle incident at Exit 66: 232nd St (Langley - District). Left lane is blocked. Expect Major delays due to congestion. Next update time Sat Apr 19 at 2:15 PM PDT. Last updated Sat Apr 19 at 1:32 PM PDT. (DBC-75559) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work at Exit 165: Flood Rd (Hope). Lane Closure. Exit ramp is closed. Expect delays. Eastbound exit 165 closed, use exit 168. Next update time Fri Apr 25 at 9:00 AM PDT. Last updated Fri Apr 11 at 9:07 AM PDT. (DBC-73987) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Speed of 80 km/hr in effect 24/7. Watch for traffic control. Next update time Tue Apr 22 at 12:00 PM PDT. Last updated Wed Apr 2 at 1:09 PM PDT. (DBC-64961) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Bolton Rd for 4.5 km (Tappen). Until Wed Dec 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. Expect up to 20 min delays. Reduced speed through work zone to 60 km/hr. Intermittent minor stoppages and single lane alternating traffic. Watch for traffic control. Next update time Mon Dec 1 at 9:00 AM PST. Last updated Thu Feb 27 at 1:35 PM PST. (DBC-72306) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW for 2.6 km (Salmon Arm to 2 km east of Tappen). Until Sat May 31. From 7:00 AM to 5:00 PM PST on weekdays and Saturday. 20 minute closure at 1 PM. Intermittent 5 minute closures and single lane alternating traffic may be required. Next update time Mon May 26 at 9:00 AM PST. Last updated Thu Feb 27 at 1:27 PM PST. (DBC-72305) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between Old Sicamous Rd and Solsqua-Sicamous Rd for 2.0 km (Sicamous). From 9:00 AM to 3:00 PM PDT on weekdays and Saturday. Road closed. Alternate route: Highway 97A and 97B. Single lane alternating traffic 8pm-6am Mon-Sat. No closure from 12 PM PDT April 17 to April 22. Resume closure April 22 12:00PM - 3:00PM PDT. Next update time Tue Apr 22 at 3:00 PM PDT. Last updated Wed Apr 16 at 10:34 PM PDT. (DBC-70490) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Blasting planned between Griffin Lake Avalanche Gate and Clanwilliam OH Bridge for 15.4 km (9 to 24 km west of Revelstoke). Starting Thu May 1 at 10:00 AM PDT until Thu May 1 at 12:00 PM PDT. Road closure planned. Next update time Thu May 1 at 12:00 PM PDT. Last updated Thu Apr 17 at 4:40 PM PDT. (DBC-75539) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Starting Tue Apr 22 until Wed May 14. Travelers should expect traffic delays up to 30 min 24 hours a day with single lane alternating traffic or closures. Next update time Thu May 15 at 12:00 PM PDT. Last updated Thu Apr 17 at 12:29 PM PDT. (DBC-73974) |
Highway 13 Southbound |
Highway 13, southbound. Construction work between the end of Highway 13 and 52 Ave for 0.9 km (Langley - District). Until Thu Jul 31. Entrance ramp closed. Eastbound Highway 1 entrance loop is closed. Eastbound exit ramp from Highway 1 onto 264th is open. Through lane after the exit loop is closed. In effect 24/7. Next update time Thu Jul 31 at 12:00 PM PDT. Last updated Sun Apr 13 at 6:26 AM PDT. (DBC-74478) |
Highway 17 Both Directions |
Highway 17 (Patricia Bay Highway), in both directions. Construction work at Exit 18: Keating Cross Rd (Central Saanich). Until Fri Aug 1. Nighttime lane closures both directions. Access to Barbara Drive from Keating Cross Road and access to East Saanich, Martindale and Danica from Highway 17 permanently closed. Keating Cross Road southbound onramp to Highway 17 closed. Next update time Tue Jul 15 at 12:00 PM PDT. Last updated Tue Mar 11 at 7:06 AM PDT. (DBC-54341) |
Highway 3A |
Highway 3A. Rock slide between Green Mountain Rd and Twin Lakes Rd for 7.3 km (12 to 20 km east of Keremeos). Single lane alternating traffic. Expect delays. Please watch for road crews. Next update time Tue Apr 22 at 1:00 PM PDT. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-75397) |
Highway 3A Both Directions |
Highway 3A, in both directions. Vehicle incident between Fraser Subdivision Rd and Hemlock Rd for 1.0 km (2 to 1 km south of Kootenay Bay Ferry Landing). Until Sat Apr 19. Single lane alternating traffic. Next update time Sat Apr 19 at 3:00 PM PDT. Last updated Sat Apr 19 at 12:07 PM PDT. (DBC-75558) |
Highway 8 |
Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.6 km (9 to 11 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Closures from April 22,23,24,25th, 9PM - 5AM. Emergency vehicles accommodated during closures. Single lane alt traffic April 22-26 may occur 7AM-5PM, 30 min delays. SITE 9/10. Next update time Sat Apr 26 at 11:00 AM PDT. Last updated Thu Apr 17 at 9:54 AM PDT. (DBC-74796) |
Highway 8 |
Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. Closures from April 23 to April 25. Expect 45 min closures between 10AM - 2PM. Emergency vehicles accommodated during closures. SITE 6. Next update time Mon Apr 28. Last updated Thu Apr 17 at 9:47 AM PDT. (DBC-74597) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Vehicle incident at Callison Rd (186 km north of Fort Nelson). From 7:00 AM to 7:00 PM MST daily. Single lane alternating traffic. Next update time Tue Apr 22 at 12:00 PM MST. Last updated Thu Apr 17 at 8:28 AM MST. (DBC-75022) |
Highway 99 Both Directions |
Highway 99, in both directions. Road cleared between Broughton St and Bidwell St for 0.4 km (Vancouver). Last updated Sat Apr 19 at 1:30 PM PDT. (DBC-75418) |
Other Roads |
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Apr 14, 2026 at 9:00 AM PDT. Last updated Mon Apr 14 at 9:09 AM PDT. (DBC-23443) |
Other Roads Both Directions |
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Apr 23, 2025 at 2:00 PM PDT. Last updated Wed Oct 23 at 1:06 PM PDT. (DBC-27390) |
Other Roads Both Directions |
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Fri Apr 17, 2026 at 2:00 PM PDT. Last updated Thu Apr 17 at 3:40 PM PDT. (DBC-28386) |
Other Roads |
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Johnston Bridge. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 8, 2026 at 9:00 AM PDT. Last updated Thu Oct 17 at 6:39 AM PDT. (DBC-47311) |
Other Roads Both Directions |
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Apr 9, 2026 at 9:00 AM PDT. Last updated Thu Apr 10 at 9:28 AM PDT. (DBC-53013) |
Other Roads Both Directions |
Canal Rd, in both directions. Construction work at Mt Norman Access Rd. Watch for traffic control. Full road closures between 10am-2pm, 7 days per week. Single lane alternating traffic will be in place outside of these hours. Limited closures of up to 15 mins through Easter Long Weekend. No full closures between April 18th to 21st. Next update time Mon Apr 21 at 2:30 PM PDT. Last updated Wed Apr 16 at 4:31 PM PDT. (DBC-61149) |
Other Roads Both Directions |
Cave Road, in both directions. Landslide at Cave Road. Road closed. Landslide on Cave Road. Next update time Wed Apr 8, 2026 at 10:00 AM PDT. Last updated Wed Apr 9 at 10:42 PM PDT. (DBC-67913) |
Other Roads |
Williams Lake Cut Off Rd. Flooding between Xats'Ull Heritage Site Way and Williams Lake Cut Off Rd. Road closed. Williams Lake Cut Off Rd is closed south of Xats'Ull Heritage Site Way and north of Springfield Ranch due to flooding. Next update time Fri Apr 25 at 2:30 PM PDT. Last updated Thu Apr 17 at 2:41 PM PDT. (DBC-73346) |
Atlin Hwy |
Atlin Hwy. Frost heaves between Discovery Ave and Yukon Border for 50.8 km (Atlin to British Columbia and Yukon Border). Last updated Sat Apr 19 at 6:52 AM PDT. (DBCRCON-221929) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Utility work planned between Roderick St and Culduthel Rd for 0.6 km (Saanich). Starting Mon Jul 7 at 10:00 PM PST until Tue Sep 30 at 5:00 AM PST. Right lane will be closed. Left lane will be closed. Expect minor delays. Watch for traffic control personnel. Last updated Wed Feb 19 at 11:59 AM PST. (DBC-72994) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Tillicum Rd and Exit 6: McKenzie Ave for 1.1 km (Saanich). Until Wed Dec 24, 2025. From 8:00 PM to 5:30 AM PST on weekdays and Sunday. Lane closures in both directions in effect. Traffic reduced to single lane both directions. Maximum width 4m. No maximum height change. Speed limit 50km/h. Last updated Fri Dec 20 at 9:03 AM PST. (DBC-71006) |
Highway 1 |
Highway 1 (TransCanada Highway). Road construction work between Exit 6: McKenzie Ave and Exit 10: Burnside Rd W for 3.8 km (View Royal to Saanich). Construction work at Colwood Interchange, Helmcken Interchange, and McKenzie Interchange until Fall 2027. Expect speed changes, traffic pattern changes, and overnight work. Next update time Fri Jun 13 at 10:00 AM PDT. Last updated Tue Mar 25 at 4:46 PM PDT. (DBC-73856) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road sweeping between Butterfield Rd and Trunk Rd for 21.4 km (Mill Bay to Duncan). From 7:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Lane Closure. Watch for traffic control. Road sweeping in effect, alternating lanes will be closed, please watch for traffic control. Last updated Mon Mar 24 at 10:14 AM PDT. (DBC-74347) |
Highway 1 Southbound |
Highway 1 (TransCanada Highway), southbound. Utility work planned between Frayne Rd and Butterfield Rd for 1.7 km (Mill Bay). Starting Wed Apr 23 at 9:00 AM PDT until Wed Apr 23 at 3:00 PM PDT. Right lane will be closed. Last updated Wed Apr 2 at 1:33 PM PDT. (DBC-74808) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Whippletree Frtg and Bench Rd for 0.8 km (2 to 3 km north of Cobble Hill). Starting Thu May 1 at 9:00 AM PDT until Thu May 1 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Mon Apr 7 at 2:31 PM PDT. (DBC-75034) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work planned between Trunk Rd and York Rd for 0.6 km (Duncan). Starting Tue May 20 until Sat Jun 14. Coronation Avenue bike lanes project. Work is on Coronation Avenue. Last updated Thu Apr 3 at 2:48 PM PDT. (DBC-74880) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned between Davis Rd and Cedar Rd for 20.8 km (Nanaimo to Ladysmith). Starting Tue Apr 22 at 4:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. From 4:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed in both directions. Watch for traffic control personnel. Last updated Thu Apr 17 at 12:50 PM PDT. (DBC-75519) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Construction work between Finlayson St and Nicol St for 0.3 km (Nanaimo). Until Thu May 29 at 3:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - Highway 1 Northbound between Crace St. And Esplanade. Right lane closed. Tuesday Apr 1 right lane closure closure 9am-5pm. Watch for work crews. Last updated Thu Mar 27 at 5:52 PM PDT. (DBC-70846) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Exit 8: Cypress Bowl Rd and Exit 10: 21st St for 2.1 km (West Vancouver). Starting Wed Apr 30 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. Shoulder will be closed. EB shoulder closure at 26th St pedestrian overpass & at Exit 8. Prepare to slow down. Last updated Wed Apr 16 at 6:24 PM PDT. (DBC-75485) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Tree pruning between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 1.6 km (North Vancouver - District to North Vancouver - City). Until Fri Apr 25. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder closed. Last updated Thu Apr 3 at 6:55 PM PDT. (DBC-74896) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work between Exit 19: Lynn Valley Rd and Exit 21: Mountain Hwy for 1.6 km (North Vancouver - District to North Vancouver - City). Until Sun Apr 20. From 10:00 PM to 5:00 AM PDT daily. Right lane closed. Shoulder closed. Last updated Thu Apr 3 at 6:58 PM PDT. (DBC-74897) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between 216th St and Exit 73 for 9.3 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:30 AM PDT on weekdays. Night time construction work. Left lane is closed in both directions. Last updated Fri Mar 21 at 1:14 PM PDT. (DBC-74277) |
Highway 1 |
Highway 1 (TransCanada Highway). Construction work between 216th St and Exit 73 for 11.4 km (Langley - District). Until Mon Jun 30. From 8:30 PM to 5:00 AM PDT daily. Lane closures in both directions in effect. Last updated Tue Apr 1 at 8:54 AM PDT. (DBC-74725) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Construction work planned between 216th St and Exit 73 for 11.4 km (Langley - District). Starting Sat Apr 26 until Sun May 11. From 8:30 PM to 10:30 AM PDT on weekends. Lane Closure. Watch for traffic control personnel. Scheduled overnight construction work. April 26/27, May 2/3, May 3/4, May 9/10 and May 10/11. Last updated Wed Apr 2 at 4:24 PM PDT. (DBC-74816) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance between Bradner Rd and 248 St for 7.2 km (Abbotsford to Langley - District). Until Wed Apr 30 at 5:00 AM PDT. From 8:30 PM to 8:00 AM PDT on weekends and from 8:30 PM to 5:00 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74743) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Maintenance between 248 St and Bradner Rd for 9.4 km (Langley - District to Abbotsford). Until Wed Apr 30 at 5:30 AM PDT. From 9:00 PM to 7:30 AM PDT on weekends and from 9:00 PM to 5:30 AM PDT on weekdays. Lane Closure. Last updated Tue Apr 1 at 4:29 PM PDT. (DBC-74749) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Road construction work at Exit 73 (Langley - District). Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT on weekdays and Saturday. Shoulder maintenance. Exit ramp work on shoulder. Last updated Tue Apr 1 at 4:32 PM PDT. (DBC-74748) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Maintenance at Exit 73 (Langley - District). Until Sat May 31 at 7:00 AM PDT. From 9:00 PM to 7:00 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays. Shoulder closed. Last updated Tue Apr 1 at 4:43 PM PDT. (DBC-74751) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Rest area closed at Bradner Rd (Abbotsford). Construction work. For more information on the closure, please refer to Highway 1 Project page: gov.Bc.Ca/264toHighway11#bradner. Next update time Sat Jul 26, 2025 at 9:00 AM PDT. Last updated Thu Sep 26 at 7:34 PM PDT. (DBC-66582) |
Highway 1 Northbound |
Highway 1 (TransCanada Highway), northbound. Utility work planned between Exit 170 and Water Ave for 2.3 km (Hope). Starting Tue Apr 22 until Mon Apr 28. From 8:00 AM to 4:00 PM PDT on weekdays. Shoulder will be closed. Left turn lane will be closed. Left hand turn lane to Water Ave closed. Left turn accessible via right lane. Last updated Thu Apr 17 at 12:45 PM PDT. (DBC-74932) |
Highway 1 |
Highway 1 (TransCanada Highway). Special event between Old Boston Bar Rd and North Bend Ferry Rd for 1.1 km (26 to 27 km south of Jackass Mountain Summit). Until Tue Apr 29 at 4:00 PM PDT. Single lane alternating traffic. Last updated Thu Apr 17 at 12:52 PM PDT. (DBC-75520) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance between Johnson Rd and Blue Lake Rd for 42.1 km (10 km south of Jackass Mountain Summit to 13 km north of Yale). From 8:00 AM to 2:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Mon Mar 31 at 7:22 AM PDT. (DBC-74665) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Old Cariboo Rd and Collins Rd for 0.8 km (Cache Creek). Until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Lane Closure. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:19 AM PDT. (DBC-74589) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Utility work planned between Juniper Beach Prov Park Access Rd and Back Valley Rd for 1.8 km (12 to 14 km east of Cache Creek). Starting Mon May 12 until Fri May 16. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Apr 16 at 9:02 AM PDT. (DBC-75457) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Utility work planned between Bale Rd and Pinecrest Dr for 1.9 km (24 to 22 km east of Cache Creek). Starting Mon May 12 until Fri May 16. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Apr 16 at 9:07 AM PDT. (DBC-75458) |
Highway 1 Westbound |
Highway 1 (TransCanada Highway), westbound. Construction work at Pacific Way (Kamloops). Until Fri May 2 at 7:00 PM PDT. Exit ramp is closed. Last updated Fri Feb 28 at 9:16 AM PDT. (DBC-73373) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Electrical maintenance planned between Nina Pl and Pat Rd (Kamloops). Starting Thu Apr 24 at 9:00 AM PDT until Thu Apr 24 at 4:00 PM PDT. Lane Closure. Last updated Mon Apr 14 at 4:10 PM PDT. (DBC-75375) |
Highway 1 Eastbound |
Highway 1 (TransCanada Highway), eastbound. Electrical maintenance planned between Blind Bay Rd and Hilltop Rd for 3.8 km (17 to 13 km west of Tappen). Starting Mon Apr 21 at 8:00 AM PDT until Fri Apr 25 at 4:00 PM PDT. Lane Closure. Right lane will be closed. Last updated Fri Apr 11 at 10:37 AM PDT. (DBC-75267) |
Highway 1 |
Highway 1 (TransCanada Highway). Utility work between Canoe Beach Dr NE and Old Sicamous Rd for 19.1 km (Salmon Arm to Sicamous). Until Wed Apr 30. Single lane alternating traffic. Watch for traffic control. BC Hydro pole replacement. Last updated Thu Mar 13 at 1:25 PM PDT. (DBC-73920) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Des Fosses Rd and Bernie Rd for 57.6 km (8 km west of Sicamous to 14 km east of Chase). There is debris on the road. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-73565) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Debris on roadway between Des Fosses Rd and Perry River Bridge for 96.4 km (25 km east of Sicamous to 14 km east of Chase). Watch for falling rocks. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-73360) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Rock slope stabilization between Three Valley Avalanche Gate and Three Valley Frtg Rd for 2.1 km (18 to 16 km west of Revelstoke). Until Sun May 18. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Tue Apr 15 at 11:57 AM PDT. (DBC-74730) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Oak Dr and Quartz Creek Bridge (Structure) for 100.3 km (Revelstoke to 14 km east of East Boundary of Glacier National Park). There is debris on the road. Last updated Sat Apr 19 at 11:09 AM PDT. (DBC-74959) |
Highway 1 |
Highway 1 (TransCanada Highway). Rest area closed at Redgrave Rest Area (14 km east of East Boundary of Glacier National Park). Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses. Last updated Fri Apr 4 at 9:52 AM MDT. (DBC-73964) |
Highway 1 Both Directions |
Highway 1 (TransCanada Highway), in both directions. Road construction work between Redgrave Rest Area and Wiseman Rd for 6.0 km (15 to 21 km east of East Boundary of Glacier National Park). Until Mon Oct 27. From 7:00 AM to 7:00 PM MDT daily. Construction zone reduced speed limit in effect. Lane widths are 5 metres each direction. Watch for crews and expect delays. Next update time Tue Jul 15 at 12:00 PM MDT. Last updated Tue Apr 15 at 9:05 PM MDT. (DBC-75437) |
Highway 1 |
Highway 1 (TransCanada Highway). Electrical maintenance planned between Forde Station Rd and Blaeberry School Rd for 3.6 km (15 to 18 km west of Golden). Starting Wed Apr 23 at 9:00 AM MDT until Wed Apr 23 at 3:00 PM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Apr 17 at 1:56 PM MDT. (DBC-75521) |
Highway 1 |
Highway 1 (TransCanada Highway). Electrical maintenance planned between Anderson Rd and 11th St N for 0.7 km (Golden). Starting Tue Apr 22 at 8:30 AM MDT until Tue Apr 22 at 5:00 PM MDT. Eastbound lane will be closed. Watch for traffic control personnel. Last updated Thu Apr 17 at 2:00 PM MDT. (DBC-75522) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned between Golden Donald Upper Rd and Yoho Bridge for 7.8 km (Golden). Starting Tue Apr 22 at 10:00 AM MDT until Tue Apr 22 at 5:00 PM MDT. Eastbound lane will be closed. Watch for traffic control personnel. Closure in the slow lane only. Reduce speed. Last updated Thu Apr 17 at 5:27 PM MDT. (DBC-75535) |
Highway 1 |
Highway 1 (Kicking Horse Pass). Maintenance planned between Golden Donald Upper Rd and Yoho Bridge (3 km east of Golden). Starting Wed Apr 23 at 9:00 AM MDT until Wed Apr 23 at 3:00 PM MDT. Westbound lane will be closed. Closure in the slow lane only. Reduce speed. Last updated Thu Apr 17 at 5:29 PM MDT. (DBC-75537) |
Highway 1 Both Directions |
Highway 1 (Kicking Horse Pass), in both directions. Watch for falling rocks between Golden Donald Upper Rd and Yoho Bridge (5 km east of Golden). Debris on roadway. Last updated Sat Apr 19 at 12:09 PM MDT. (DBC-44269) |
Highway 10 |
Highway 10. Utility work between Panorama Dr and 152 St (Surrey). Watch for traffic control. Crews will be working east of Highway 10. Last updated Tue Mar 25 at 9:28 AM PDT. (DBC-74419) |
Highway 10 Westbound |
Highway 10, westbound. Construction work between 152 St and Panorama Dr for 0.4 km (Surrey). Until Wed Apr 30. From 9:00 AM to 3:00 PM PDT daily. Right turn lane closed. Shoulder closed. Sidewalk restoration. Watch for traffic control. Last updated Thu Apr 17 at 3:26 PM PDT. (DBC-75533) |
Highway 10 Both Directions |
Highway 10, in both directions. Utility work at 72 Ave (Langley - District). Until Sun Jun 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT daily. Shoulder maintenance. On and off-ramps from 232nd street will be impacted by work. Watch for crews and pass with caution. Last updated Fri Mar 21 at 1:27 PM PDT. (DBC-74278) |
Highway 101 Both Directions |
Highway 101, in both directions. Line painting at Monkey Tree Lane (Sechelt). Until Fri Apr 25. From 7:00 AM to 7:00 PM PDT on weekdays. Utility work. Last updated Tue Apr 8 at 5:44 PM PDT. (DBC-75110) |
Highway 101 Westbound |
Highway 101, westbound. Utility work planned between Nestman Rd and Selma Park Rd for 0.9 km (Sechelt). Starting Thu Jul 3 until Sat Jul 19. From 8:00 AM to 4:00 PM PST daily. Right lane will be closed. Single lane alternating traffic will be in effect. Last updated Thu Jan 30 at 11:05 AM PST. (DBC-72411) |
Highway 11 Both Directions |
Highway 11, in both directions. Industrial traffic may slow or block regular traffic. Between McClary Ave and Delair Rd (Abbotsford). Until Thu May 8. From 7:00 PM to 6:00 AM PDT on weekends. Watch for traffic control. Construction vehicles will be travelling along the shoulder. No lane closures are planned. Next update time Thu May 8 at 6:00 PM PDT. Last updated Thu Apr 10 at 1:35 PM PDT. (DBC-73478) |
Highway 11 |
Highway 11. Bridge construction between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Fri May 9. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. NB work until May 3: 1 lane closed. Width restriction 3.8m. Loads over 3.8m may not cross until 4:30AM, supervised with 7 days notice. Speed bumps 24hrs/day. Last updated Sat Apr 12 at 1:47 AM PDT. (DBC-74538) |
Highway 13 Both Directions |
Highway 13, in both directions. Construction work at 56 Ave (Langley - District). Until Thu Jul 31. From 7:00 AM to 7:00 PM PDT daily. Detour in effect. Entrance ramp closed. Last updated Thu Mar 20 at 9:08 AM PDT. (DBC-74197) |
Highway 14 |
Highway 14. Road maintenance work between Deering Rd and Petrel Dr for 36.5 km (Port Renfrew to 1 km west of Jordan River). Watch for loose gravel and traffic pattern changes. Last updated Wed Oct 23 at 6:33 PM PDT. (DBC-69530) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Croce Rd and Maple Ave S for 1.4 km (Sooke). Until Fri May 2. From 12:00 AM to 5:00 AM PDT daily. Shoulder maintenance. Last updated Tue Apr 1 at 10:09 AM PDT. (DBC-74727) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Murray Rd and Anna Marie Rd for 0.3 km (Sooke). Until Sat Apr 26. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Last updated Mon Apr 14 at 12:55 PM PDT. (DBC-75361) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Church Rd and Phillips Rd for 1.1 km (Sooke). Until Wed Dec 31. Lane Closure. Watch for traffic control. Last updated Fri Apr 11 at 1:38 PM PDT. (DBC-75277) |
Highway 14 Both Directions |
Highway 14, in both directions. Utility work between Lazzar Rd and Woodlands Rd for 1.7 km (Sooke). Until Fri May 9. From 9:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Wed Apr 2 at 1:03 PM PDT. (DBC-74804) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Roadside brushing between 4 Ave and 32 Ave for 5.6 km (Surrey). Until Fri Apr 25 at 3:00 PM PDT. Right lane is blocked. Shoulder closed. Powerline maintenance for BC Hydro. Last updated Thu Apr 10 at 3:19 PM PDT. (DBC-75230) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work planned between 20 Ave and 24 Ave for 0.8 km (Surrey). Starting Tue Apr 22 until Fri Apr 25. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane will be closed. Last updated Thu Apr 17 at 1:10 PM PDT. (DBC-75524) |
Highway 15 Northbound |
Highway 15 (Pacific Highway), northbound. Utility work between 32 Ave and 40 Ave for 1.6 km (Surrey). Until Mon May 12. From 7:00 AM to 7:00 PM PDT on weekdays. Last updated Thu Mar 13 at 3:24 PM PDT. (DBC-73932) |
Highway 15 Southbound |
Highway 15 (Pacific Highway), southbound. Utility work between 60 Ave and 58 Ave for 0.1 km (Surrey). Until Mon Jun 30. From 9:00 AM to 3:00 PM PDT daily. Shoulder closed. Right lane closed. Southbound sidewalk closed. Pedestrians must cross at 60 Ave or 58 Ave. Last updated Mon Apr 14 at 11:23 AM PDT. (DBC-75355) |
Highway 16 Both Directions |
Highway 16 (on Haida Gwaii), in both directions. Bridge maintenance between E Cedar Ave and Beitush Rd for 6.3 km (7 km west of Tlell to 5 km east of Port Clements). Bridge repairs in effect at Woodpile Bridge. Speed reduction, reduce speed. Next update time Mon Apr 21 at 12:30 PM PDT. Last updated Fri Apr 18 at 12:31 PM PDT. (DBC-74895) |
Highway 16 |
Highway 16 (Yellowhead Highway). Utility work planned between East Amsbury and Spokeshute St for 8.3 km (9 to 1 km west of Terrace). Starting Tue Apr 22 until Thu Apr 24. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Apr 17 at 2:42 PM PDT. (DBC-74797) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road sweeping between Suskwa Forest Service Rd and Owens Rd for 41.5 km (12 km west of Smithers to 10 km east of New Hazelton). From 7:30 AM to 4:30 PM PDT on Wednesday, Thursday and Friday. Please watch for crews and slow moving vehicles. Last updated Wed Mar 26 at 6:06 PM PDT. (DBC-74461) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Geotechnical investigation planned between Glacier St and Queen St for 0.3 km (Smithers). Starting Tue Apr 22 at 8:00 AM PDT until Fri Apr 25 at 5:00 PM PDT. Eastbound lane will be closed. Expect minor delays. Last updated Thu Apr 17 at 10:58 AM PDT. (DBC-75512) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Utility work planned between Myers Pit Rd and Fraser Mountain Rd for 2.5 km (6 to 3 km west of Fort Fraser). Starting Wed Apr 23 at 8:00 AM PDT until Wed Apr 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control personnel. Last updated Wed Apr 16 at 8:48 AM PDT. (DBC-75456) |
Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Maintenance planned between Penny Access Rd and Dome Creek Rd for 7.4 km (45 to 53 km east of Purden Lake). Starting Fri Apr 25 at 7:00 AM PDT until Fri Apr 25 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Apr 16 at 11:38 AM PDT. (DBC-75468) |
Highway 17 Southbound |
Highway 17 (Patricia Bay Highway), southbound. Special event planned between Lands End Rd and Exit 31 (North Saanich). Starting Wed Jul 23 at 6:00 PM PDT until Wed Jul 23 at 7:30 PM PDT. Victoria Wheelers Cycling Club Bike Race - watch for cyclists at Wain Rd off ramp. Last updated Tue Mar 25 at 9:50 AM PDT. (DBC-74423) |
Highway 17 Eastbound |
Highway 17, eastbound. Maintenance planned between Highway 91 Connector and Grace Rd for 0.8 km (Delta). Starting Mon Apr 21 at 8:00 AM PDT until Mon Apr 21 at 3:00 PM PDT. Lane Closure. Expect delays. Last updated Thu Apr 17 at 2:02 PM PDT. (DBC-75527) |
Highway 19 |
Highway 19 (Island Highway). Utility work planned between Island Hwy and Byng Rd for 1.1 km (Port Hardy). Starting Thu Apr 24 at 9:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. Westbound on Douglas St, Right Turn Lane Closure, between Byng Rd and Bear Cove Hwy.
-
Eastbound on Douglas Dt, Lane shift, between Goodspeed Rd and Bear Cove Hwy. Last updated Wed Apr 16 at 3:51 PM PDT. (DBC-75478) |
Highway 19 |
Highway 19 (Island Highway). Tree pruning between Eagles Nest Rest Area and Englewood Dr for 5.8 km (Woss). Until Tue Apr 22 at 4:00 PM PDT. BC Hydro Vegetation Maintenance. Last updated Tue Apr 8 at 3:31 PM PDT. (DBC-75104) |
Highway 19 Northbound |
Highway 19 (Island Highway), northbound. Utility work between Big Tree Creek Rest Area and Mountview Dr for 13.0 km (34 to 47 km north of Campbell River). BC Hydro Pole replacement. Last updated Mon Feb 10 at 9:51 AM PST. (DBC-72724) |
Highway 19 |
Highway 19 (Inland Island Highway). Electrical maintenance planned at Parksville Exit (Highway 19A) (1 km south of Parksville). Starting Wed Apr 23 at 8:30 AM PDT until Wed Apr 23 at 11:30 AM PDT. Shoulder will be closed. Watch for traffic control personnel. Last updated Fri Apr 4 at 9:56 AM PDT. (DBC-74913) |
Highway 19 Both Directions |
Highway 19 (Inland Island Highway), in both directions. Bridge maintenance planned between Church Rd and Cranberry Ave for 43.5 km (Nanaimo to 1 km north of Parksville). Starting Tue Apr 22 at 4:00 AM PDT until Fri May 2 at 3:00 PM PDT. From 4:00 AM to 3:00 PM PDT on weekdays. Right lane will be closed in both directions. Watch for traffic control personnel. Last updated Thu Apr 17 at 12:44 PM PDT. (DBC-75518) |
Highway 19A |
Highway 19A (Island Highway). Electrical maintenance planned between Exit 46 and Franklin's Gull Rd (Parksville). Starting Wed Apr 23 at 11:30 AM PDT until Wed Apr 23 at 2:30 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Last updated Fri Apr 4 at 10:02 AM PDT. (DBC-74915) |
Highway 19A |
Highway 19A (Island Highway). Tree pruning between Buckley Bay Rd and Royston Rd for 15.8 km (Buckley Bay Ferry Terminal to 2 km south of Courtenay). Until Fri May 2 at 4:00 PM PST. Single lane alternating traffic. Tree maintenance around BC Hydro poles/lines Mon-Fri 9-3. Last updated Mon Jan 27 at 10:19 AM PST. (DBC-72227) |
Highway 19A Both Directions |
Highway 19A (Island Highway), in both directions. Utility work planned between Finlay Rd and Catherwood Rd for 0.8 km (12 to 13 km south of Campbell River). Starting Tue Apr 22 at 9:00 AM PDT until Wed Apr 23 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Aerial placing on existing poles. Last updated Thu Apr 10 at 11:31 AM PDT. (DBC-75209) |
Highway 19A |
Highway 19A (Island Highway). Construction work planned between Henry Rd and Heard Rd for 2.8 km (4 to 1 km south of Campbell River). Starting Wed Jun 4 at 7:00 AM PDT until Fri Jan 30, 2026 at 7:00 PM PDT. Multiple locations. Work at each location done within 3 hrs. Last updated Tue Apr 8 at 2:45 PM PDT. (DBC-75100) |
Highway 20 |
Highway 20. Utility work between MacK Rd and Walker Park Rd for 0.9 km (9 to 10 km east of Bella Coola). Until Fri May 30. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watermain Installation. Please watch for signage and personnel. Expect minor delays of up to ten minutes. Last updated Mon Apr 14 at 9:33 AM PDT. (DBC-75347) |
Highway 20 |
Highway 20. Watch for slippery sections between Olsen Dr and Rainbow Range Trailhead for 77.7 km (16 km east of Bella Coola to 39 km west of Anahim Lake). Muddy sections. Last updated Sat Apr 19 at 11:09 AM PDT. (DBCRCON-222051) |
Highway 20 |
Highway 20. Frost heaves between Hunlen Falls Turner Lakes Trailhead and Sawmill Creek Rd for 136.7 km (39 km west of Anahim Lake to Tatla Lake). Last updated Sat Apr 19 at 11:09 AM PDT. (DBCRCON-222075) |
Highway 23 Both Directions |
Highway 23, in both directions. Watch for falling rocks between Revelstoke Dam Avalanche Gates and Mica Dam for 146.6 km (Revelstoke to 5 km north of Mica Dam). Debris on roadway. Last updated Sat Apr 19 at 11:09 AM PDT. (DBC-74960) |
Highway 26 Both Directions |
Highway 26, in both directions. Ditching between 500 Nyland Lake Rd and Norton Creek Rd for 5.0 km (25 to 20 km east of Quesnel). Single lane alternating traffic. Watch for crews and machines working. Last updated Tue Apr 8 at 8:44 AM PDT. (DBC-75071) |
Highway 27 Both Directions |
Highway 27, in both directions. Utility work planned between Blue Mountain Rd and Riverbank Rd for 26.8 km (5 to 32 km south of Fort St James). Starting Wed Apr 23 at 8:00 AM PDT until Wed Apr 30 at 6:00 PM PDT. Lane Closure. Watch for traffic control personnel. Last updated Wed Apr 16 at 8:42 AM PDT. (DBC-75455) |
Highway 28 |
Highway 28. Utility work between Gold River Hwy and Western Mine Rd for 39.7 km (Gold River to 37 km west of Campbell River). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Minor Delays, Fibre Optic Conduit Placement. Last updated Thu Mar 13 at 2:23 PM PDT. (DBC-73923) |
Highway 28 Both Directions |
Highway 28, in both directions. Bridge maintenance at Western Mine Rd (37 km west of Campbell River). Until Fri May 30 at 7:30 PM PDT. From 7:30 AM to 6:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Active working hours 7:30am to 6:00pm. This is a 24hr 7 day a week operation at Buttle Narrows. Last updated Mon Mar 24 at 12:32 PM PDT. (DBC-74354) |
Highway 29 |
Highway 29. Utility work between Asleson Rd and Weiland Rd for 4.9 km (Chetwynd). Until Fri Apr 25. From 8:00 AM to 4:00 PM MST on weekdays. Single lane alternating traffic. Southbound lane closure. Watch for traffic control. Last updated Mon Apr 7 at 2:03 PM MST. (DBC-74214) |
Highway 29 |
Highway 29. Road sweeping between Jackfish Lake Rd and Moberly Lake Rd for 15.6 km (17 to 1 km north of Chetwynd). From 6:00 AM to 4:30 PM MST on Tuesday, Wednesday and Thursday. Road and barrier sweeping taking place, watch for slow moving vehicles in the area. Last updated Mon Apr 14 at 1:14 PM MST. (DBC-75363) |
Highway 29 |
Highway 29. Utility work between N Access Rd and Lakeshore Dr for 26.3 km (Chetwynd). Until Wed Apr 30. From 8:00 AM to 4:00 PM MST on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Thu Mar 27 at 4:43 PM MST. (DBC-74565) |
Highway 29 Both Directions |
Highway 29, in both directions. Utility work between 283 Rd and Tompkins Frtg for 4.1 km (73 to 69 km north of Hudson's Hope). Until Wed Apr 30. From 7:00 AM to 6:00 PM MST on weekdays. Single lane alternating traffic. Last updated Wed Apr 2 at 8:30 AM MST. (DBC-74782) |
Highway 3 |
Highway 3 . Maintenance planned at Newton Road 5 km east of Keremeos. Starting Mon Jun 2 at 7:00 AM PST until Fri Jun 6 at 4:00 PM PST. Shoulder will be closed. Work taking place on Newton Road. Last updated Mon Jan 27 at 4:23 PM PST. (DBC-72315) |
Highway 3 |
Highway 3 (Crowsnest Highway). Industrial traffic may slow or block regular traffic. Between Exit 173: Old Hope Princeton Way and First Avalanche Gate for 1.2 km (4 to 3 km east of Hope). Starting Tue Apr 22 at 7:00 AM PDT until Thu Apr 24 at 7:00 PM PDT. Right lane will be blocked. Right lane closure from Mt. Hope Forest Service Rd. To Highway 3/5 split for hauling from the quarry. Last updated Thu Apr 17 at 4:25 PM PDT. (DBC-75536) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Second Avalanche Gate and Allison Pass Summit for 7.9 km (33 to 40 km east of Hope). Until Mon Dec 1. Expect delays. Lane Closure. Temporary detour at Snass Creek Bridge. Last updated Tue Apr 1 at 8:41 AM PDT. (DBC-74724) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Road maintenance work planned between Allison Pass Summit and Second Avalanche Gate for 15.2 km (54 to 39 km east of Hope). Starting Wed Apr 23 at 9:00 AM PDT until Wed Apr 23 at 5:00 PM PDT. Spill clean up. Watch for crews working on the shoulder. Last updated Tue Apr 15 at 2:46 PM PDT. (DBC-75424) |
Highway 3 |
Highway 3 (Crowsnest Highway). Utility work between Allison Pass Summit and Manning Park Resort (58 km east of Hope). Until Thu May 15 at 4:30 PM PDT. Lane Closure. Hydro Pole replacement from Gibson Pass Rd. To Manning Park. Last updated Tue Apr 15 at 2:51 PM PDT. (DBC-75425) |
Highway 3 Westbound |
Highway 3 (Crowsnest Highway), westbound. Utility work planned between Copper Mountain Rd and Vermilion Ave for 0.5 km (Princeton). Starting Wed Apr 23 until Wed Apr 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Right turn lane will be closed. Centre lane will be closed. Work area between Vermilion Ave and Highway 3/5A junction. Last updated Wed Apr 9 at 9:07 AM PDT. (DBC-75137) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Wilgress Lake Rest Area and Granby Rd for 26.1 km (2 km west of Eholt Summit to Grand Forks). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73820) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between East Lake Dr and Highway 3B for 39.8 km (Christina Lake to 24 km west of Castlegar). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73822) |
Highway 3 |
Highway 3 (Crowsnest Highway). Watch for falling rocks between Junction Hwy 6NS and West Creston Rd for 55.4 km (14 km east of Salmo to 10 km west of Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73304) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Watch for falling rocks between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass). Next update time Mon Jun 2 at 11:30 AM PDT. Last updated Thu Apr 10 at 11:53 AM PDT. (DBC-75211) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Maintenance planned between Loop Rd and Peavine Bridge (9 km east of Moyie). Starting Tue Apr 22 at 8:00 AM MDT until Tue Apr 22 at 5:00 PM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Apr 17 at 11:44 AM MDT. (DBC-75510) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Road sweeping between Jim Smith Lake Rd and 30th Ave N for 5.7 km (Cranbrook). Until Mon May 5. From 8:00 AM to 3:30 PM MDT daily. Lane closures in both directions in effect. Intermittent closures will take place as crews work. One lane in both directions will be maintained. Last updated Fri Mar 7 at 2:59 PM MDT. (DBC-73673) |
Highway 3 Both Directions |
Highway 3 (Crowsnest Highway), in both directions. Construction work between Alexander Bridge and Michel Creek Rd for 1.8 km (Sparwood). Until Tue Apr 22. From 7:00 AM to 6:00 PM MDT on weekdays. Single lane alternating traffic. Watch for traffic control. Reduced speed to 50km/hr. Last updated Thu Apr 17 at 12:42 PM MDT. (DBC-75515) |
Highway 30 |
Highway 30. Utility work between Marble River Rest Area and South Hardy Mainline for 2.0 km (14 to 16 km north of Port Alice). Until Thu May 1 at 7:00 PM PDT. Single lane alternating traffic. Underground Utility Locates & Geophysical Survey Excluding Weekends. Last updated Thu Feb 20 at 9:34 AM PDT. (DBC-73032) |
Highway 31 |
Highway 31. Watch for falling rocks between Cascade Creek Mainline and Junction Hwy 23 for 57.5 km (Trout Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-74515) |
Highway 33 Both Directions |
Highway 33, in both directions. Utility work between Ziprick Rd and Highway 97 for 0.2 km (Kelowna). Until Sat May 10 at 7:00 AM PDT. From 7:00 PM to 7:00 AM PDT daily. Lane closures in both directions in effect. Last updated Mon Apr 7 at 11:30 AM PDT. (DBC-75021) |
Highway 37 |
Highway 37. Frost heaves between Deltaic Cr Bridge and the end of Highway 37 for 499.4 km (26 km south of Bell II to British Columbia and Yukon Border). Last updated Sat Apr 19 at 6:52 AM PDT. (DBCRCON-222086) |
Highway 37A Both Directions |
Highway 37A, in both directions. Watch for falling rocks between Bitter Cr. Bridge and Surprise Pullout/Windy Chain Up for 34.6 km (13 km west of Meziadin to 11 km east of Stewart). There is debris on the road. Next update time Fri Apr 25 at 12:00 PM PDT. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-74957) |
Highway 3A |
Highway 3A. Watch for falling rocks between Kootenay Bay Ferry and Junction Hwy 3 for 78.0 km (1 km north of Kootenay Bay Ferry Landing to Creston). Last updated Tue Apr 1 at 4:26 AM PDT. (DBC-73148) |
Highway 4 Both Directions |
Highway 4, in both directions. Utility work planned between Sproat Lake Viewpoint and Bingo Bay for 0.2 km (19 km west of Port Alberni to 19 km east of Sutton Pass Summit). Starting Mon Apr 28 at 9:00 AM PDT until Fri May 2 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility work - BC Hydro pole transfer - watch for work crews. Last updated Tue Apr 15 at 12:41 PM PDT. (DBC-74729) |
Highway 4 Both Directions |
Highway 4, in both directions. Construction work between Elizabeth St and Helen St for 0.2 km (Port Alberni). Until Thu May 1 at 5:00 PM PDT. Right lane closed. Expect minor delays. Watch for traffic control. Construction work - watch for work crews. Last updated Wed Apr 2 at 9:48 AM PDT. (DBC-74413) |
Highway 4 Both Directions |
Highway 4, in both directions. Maintenance between Port Alberni Summit and Chalet Rd for 9.5 km (Cathedral Grove). Vehicles/loads over 3.2m in width must contact Permit Centre for instructions at 1-800-559-9688. Next update time Fri Aug 1 at 10:00 AM PDT. Last updated Wed Apr 2 at 10:13 AM PDT. (DBC-52953) |
Highway 4 Eastbound |
Highway 4, eastbound. Construction work planned between Epron Rd and Redman Rd for 0.1 km (8 km west of Qualicum Beach). Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 12:00 PM PDT. Right lane will be closed. Expect minor delays. Watch for traffic control personnel. Watch for speed reduction and work crews. Last updated Thu Apr 17 at 1:05 PM PDT. (DBC-75523) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work planned between Burbank Rd and Hilliers Rd S for 0.1 km (5 km west of Qualicum Beach). Starting Tue Apr 29 at 1:00 PM PDT until Tue Apr 29 at 5:00 PM PDT. Shoulder will be closed. Watch for traffic control personnel. Utility Work - BC HYDRO pole maintenance- watch for work crews. Last updated Mon Apr 7 at 1:39 PM PDT. (DBC-75031) |
Highway 4 Eastbound |
Highway 4, eastbound. Utility work planned between McLean Rd and Rupert Rd W for 0.4 km (1 km west of Qualicum Beach). Starting Thu May 1 at 9:00 AM PDT until Thu May 1 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Utility work - BC Hydro Pole replacement. Watch for speed reduction and work crews. Last updated Tue Apr 8 at 8:51 AM PDT. (DBC-75074) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Vehicle recovery planned at Exit 202: Portia (11 km south of Great Bear Snowshed). Starting Tue Apr 22 at 9:00 AM PDT until Tue Apr 22 at 4:00 PM PDT. Exit closed for vehicle incident clean up. Last updated Thu Apr 17 at 12:43 PM PDT. (DBC-75517) |
Highway 5 Northbound |
Highway 5 (Coquihalla South), northbound. Road sweeping between Exit 286: Merritt - 97C and Exit 315: Helmer Rd for 29.2 km (Merritt to 7 km south of Surrey Lake Summit). Until Sat Apr 19 at 5:00 PM PDT. Left lane is closed. Watch for crew and machines working. Last updated Sat Apr 19 at 9:51 AM PDT. (DBC-75556) |
Highway 5 Southbound |
Highway 5, southbound. Utility work planned between Holland Rd and Lost Creek Rd for 3.7 km (3 to 7 km north of Clearwater). Starting Mon Apr 28 until Thu May 15. From 7:00 AM to 5:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu Mar 13 at 4:25 PM PDT. (DBC-73940) |
Highway 6 EW |
Highway 6 EW. Paving operations planned between Robazzo Rd and Idler Rd for 19.7 km (15 km west of Nakusp to 17 km east of Fauquier). Starting Wed Apr 23 until Thu May 15. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Expect delays. Last updated Fri Apr 11 at 3:06 PM PDT. (DBC-75294) |
Highway 6 NS Both Directions |
Highway 6 NS, in both directions. Watch for falling rocks between Summit Lake Rd and Memphis Creek for 50.2 km (7 km north of Slocan to Summit Lake). Last updated Tue Apr 1 at 4:27 AM PDT. (DBC-73130) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Bridge maintenance planned between Schoolhouse St and Colony Farm Rd for 0.4 km (Coquitlam). Starting Mon Apr 21 at 11:00 PM PDT until Tue Apr 22 at 5:00 AM PDT. Right lane will be closed. Shoulder will be closed. Slow Lane Closed for Highway 7 Eastbound closed at United Boulevard Off Ramp
Shoulder Closed for United Boulevard On Ramp to Hwy 7 Eastbound. Last updated Thu Apr 17 at 2:50 PM PDT. (DBC-75532) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work planned between 203 St and 207 St for 0.7 km (Maple Ridge). Starting Mon Apr 21 at 9:00 AM PDT until Fri Apr 25 at 3:00 PM PDT. Lane Closure. Last updated Wed Apr 2 at 2:13 PM PDT. (DBC-74809) |
Highway 7 Eastbound |
Highway 7 (Lougheed Highway), eastbound. Construction work planned between Laity St and 216 St for 0.4 km (Maple Ridge). Starting Tue Apr 29 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday and Wednesday. Right lane will be closed. Shoulder will be closed. Last updated Fri Apr 11 at 11:33 AM PDT. (DBC-75275) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 22-26, April 28-May 3. WB right turn to 272nd closed. Detour at 263rd. Construction speed limit 50km/hr. River Rd single lane alternating as needed. Next update time Sat Apr 26 at 6:00 PM PDT. Last updated Thu Apr 17 at 6:06 PM PDT. (DBC-70968) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Construction work between Madaris Rd and Rowan Rd for 2.0 km (2 to 4 km east of Mission). Until Wed Apr 30. From 9:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control. Last updated Mon Mar 31 at 9:20 AM PDT. (DBC-74678) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Utility work between Hawkins Pickle Rd and Gledhill Rd for 1.1 km (3 to 4 km east of Mission). Until Wed Apr 30 at 3:00 PM PDT. Watch for traffic control. Last updated Fri Mar 28 at 4:12 PM PDT. (DBC-74614) |
Highway 7 |
Highway 7 (Lougheed Highway). Road sweeping between Harrison Bay Rd and Kennedy Rd for 5.7 km (Kent). Single lane alternating traffic. Sweeping taking place on Highway 7 from Harrison Bay store to Sasquatch in then to Morris Valley rd. Please watch for slow moving vehicles. Last updated Wed Mar 26 at 8:07 AM PDT. (DBC-74465) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Road sweeping between Scowlitz Access Rd and Highlands Blvd for 8.6 km (Kent). Single lane alternating traffic. Expect delays. Watch for traffic control and sweeper working. Last updated Tue Mar 25 at 7:05 AM PDT. (DBC-74407) |
Highway 7 Both Directions |
Highway 7 (Lougheed Highway), in both directions. Bridge maintenance between Seabird Island Rd and Ruby Creek Rd for 15.0 km (Kent). Lane Closure. Watch for traffic control. Last updated Tue Mar 25 at 7:23 AM PDT. (DBC-74408) |
Highway 7B Eastbound |
Highway 7B (Mary Hill Bypass), eastbound. Construction work between Broadway St and Kingsway Ave for 1.2 km (Port Coquitlam). Until Mon May 12 at 2:00 PM PST. From 6:00 AM to 2:00 PM PST daily. Right lane closed. Bus stop improvement project. Last updated Thu Jan 9 at 12:17 PM PST. (DBC-70617) |
Highway 8 |
Highway 8. Watch for falling rocks between the start of Highway 8 and Dot Ranch Cut-Off Rd West for 34.8 km (Spences Bridge to 29 km west of Merritt). There is debris on the road. Last updated Thu Apr 17 at 7:00 PM PDT. (DBC-72877) |
Highway 8 |
Highway 8. Road construction work between the start of Highway 8 and Porcupine Ridge Rd for 1.0 km (8 to 9 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 11. Next update time Mon Apr 28 at 5:00 PM PDT. Last updated Thu Apr 17 at 9:47 AM PDT. (DBC-73833) |
Highway 8 |
Highway 8. Construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.5 km (12 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 8. Next update time Mon Apr 28. Last updated Thu Apr 17 at 9:47 AM PDT. (DBC-74599) |
Highway 8 |
Highway 8. Road construction work between Porcupine Ridge Rd and 14 Mile Ranch Rd for 0.7 km (17 to 18 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Expect delays. Watch for traffic control. SITE 5. Next update time Mon Apr 28 at 5:00 PM PDT. Last updated Thu Apr 17 at 9:46 AM PDT. (DBC-73832) |
Highway 8 |
Highway 8. Construction work between Shackan IR and Dot Ranch Cut-Off Rd East for 0.8 km (21 to 22 km east of Spences Bridge). Until Wed Apr 30 at 5:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Expect delays. SITE 4. Next update time Mon Apr 28. Last updated Thu Apr 17 at 9:48 AM PDT. (DBC-74592) |
Highway 91 |
Highway 91. Road maintenance work at Highway 91 Connector. Until Fri Apr 25. From 7:00 AM to 5:00 PM PDT on weekdays. Shoulder maintenance. Last updated Fri Apr 11 at 3:28 PM PDT. (DBC-75295) |
Highway 91 Southbound |
Highway 91, southbound. Bridge maintenance planned between Exit 11: Westminster Hwy and Nordel Crt for 3.2 km (Delta to Richmond). Starting Mon Apr 21 at 10:00 PM PDT until Fri Apr 25 at 4:30 AM PDT. From 10:00 PM to 4:30 AM PDT on weekdays. Right lane will be closed. Centre lane will be closed. Last updated Thu Apr 17 at 2:26 PM PDT. (DBC-75529) |
Highway 91 Both Directions |
Highway 91, in both directions. Construction work planned at Exit 8: Nordel Way (Delta). Starting Tue Apr 22 at 7:00 AM PDT until Fri Apr 25 at 5:00 PM PDT. Lane closures in both directions planned. Work on north and south bridge span of Hwy 91 overpass. Concrete finishing repair. Last updated Wed Apr 16 at 2:56 PM PDT. (DBC-75474) |
Highway 93 Both Directions |
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St for 3.1 km (Radium Hot Springs). Until Thu Jul 10 at 7:00 PM MDT. From 7:00 AM to 7:00 PM MDT on weekdays and Saturday. Watch for traffic control. Expect delays. Speed 70km/h from 12:00 PM Thursday, April 17, 2025 to 12:00pm MDT April 22, 2025. Last updated Thu Apr 17 at 12:58 PM MDT. (DBC-73931) |
Highway 93 Both Directions |
[Truncated] Highway 93, in both directions. Utility work planned at McKay Creek Maint (4 km north of Radium Hot Springs). Starting Wed Apr 23 at 7:00 AM MDT until Fri Apr 25 at 7:00 PM MDT. Single lane alternating traffic will be in effect. Utility investigation between McKay creek and the Iron Gates Tunnel. Lane reduction with single lane alternating traffic through work zone and intermittent closures of both lanes. Delay length of 10 mins. In both directions. Speed limit reduced to 50 km/h in |
Highway 95A Southbound |
Highway 95A, southbound. Maintenance planned between Torrent Rd and Elk Dr for 3.6 km (23 to 26 km north of Kimberley). Starting Tue Apr 22 until Wed Apr 30. From 9:00 AM to 5:00 PM MDT daily. Last updated Wed Apr 16 at 10:34 AM MDT. (DBC-75461) |
Highway 97 Southbound |
Highway 97, southbound. Road construction work between Sandhill Rd and Pineview Dr (1 km south of Penticton). Until Fri Oct 24. Lane Closure. Shoulder closed. Industrial traffic may slow or block regular traffic. Highway extension work. Constructing new intersection and installing new traffic lights. Last updated Tue Jan 14 at 9:05 PM PST. (DBC-71783) |
Highway 97 |
Highway 97. Electrical maintenance between Johnson St and Jones Flat Rd for 6.3 km (Summerland). Until Fri May 2. From 8:00 AM to 3:30 PM PDT on weekdays. Lane closures in both directions in effect. Watch for traffic control. Last updated Mon Apr 14 at 2:32 PM PDT. (DBC-75372) |
Highway 97 Both Directions |
Highway 97, in both directions. Maintenance planned between N Beach Rd and Brent Rd for 4.7 km (2 km south of Peachland to 5 km north of Summerland). Starting Tue Apr 22 at 9:00 AM PDT until Fri May 2 at 3:00 PM PDT. Lane Closure. Left turn lane will be closed. Last updated Thu Apr 10 at 11:19 AM PDT. (DBC-75206) |
Highway 97 Both Directions |
Highway 97, in both directions. Electrical maintenance planned between Park Ave and Brent Rd for 3.1 km (2 to 5 km south of Peachland). Starting Tue Apr 22 at 9:00 AM PDT until Wed Apr 30 at 3:00 PM PDT. Lane Closure. April 22-30 9am to 3 pm
Intermittent lane closures - 1 lane open in each direction. Insulation of Roadway lighting between Summerland and Peachland along Radio Tower Access Rd for 2 kms. Last updated Thu Apr 17 at 2:04 PM PDT. (DBC-75528) |
Highway 97 Both Directions |
Highway 97, in both directions. Paving operations planned between Gatzke Rd and Clerke Rd for 15.9 km (Coldstream to 13 km north of Kelowna). Starting Tue Apr 22 until Mon Jun 30. From 3:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control personnel. Last updated Fri Apr 11 at 12:03 PM PDT. (DBC-75276) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. Shoulder maintenance between Lakeview Cres and Donald Rd for 0.7 km (Williams Lake). Until Wed Apr 30. From 6:00 AM to 7:00 PM PDT on weekdays. Intersection open to traffic. Expect delays. Please watch for signage and personnel. Last updated Mon Mar 24 at 1:27 PM PDT. (DBC-74362) |
Highway 97 Both Directions |
Highway 97 (Cariboo Connector), in both directions. There will be ditching between Hush Lake Rd and Cinema Rd for 2.0 km (24 to 26 km south of Hixon). Starting Tue Apr 22 at 8:00 AM PDT until Tue Apr 22 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Thu Apr 17 at 10:57 AM PDT. (DBC-75511) |
Highway 97 Northbound |
Highway 97 (Cariboo Connector), northbound. Utility work between Plett No 1 Rd and Yardley Rd for 2.2 km (7 to 5 km south of Hixon). Until Fri Apr 25. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of 5 minutes. No work to take place on long weekends (Apr. 18-21). Please watch for signage and personnel. Last updated Fri Apr 11 at 1:56 PM PDT. (DBC-75288) |
Highway 97 |
Highway 97 (Cariboo Connector). Rest area closed between Charles Rd and Anderson Rd (15 km south of Pineview). Last updated Fri Dec 27 at 8:11 AM PST. (DBC-71474) |
Highway 97 Southbound |
Highway 97, southbound. Utility work planned between North Nechako Rd and 5th Ave for 0.6 km (Prince George). Starting Mon Apr 28 at 9:00 AM PDT until Tue Apr 29 at 3:00 PM PDT. Left lane will be closed. Last updated Mon Apr 14 at 3:49 PM PDT. (DBC-75374) |
Highway 97 Northbound |
Highway 97, northbound. Utility work planned between Shamrock Rd and Collins Rd for 0.9 km (Prince George). Starting Wed Apr 23 at 8:00 AM PDT until Fri Apr 25 at 4:00 PM PDT. Right lane will be closed. Last updated Fri Apr 11 at 11:18 AM PDT. (DBC-75273) |
Highway 97 |
Highway 97. Road sweeping between Chief Lake Rd and Kloss Rd for 142.1 km (Prince George to 16 km north of McLeod Lake). From 7:00 AM to 5:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Shoulder closed. Last updated Mon Apr 7 at 6:46 AM PDT. (DBC-74987) |
Highway 97 Both Directions |
Highway 97, in both directions. Bridge construction between Wright Creek Rd and Kinney Rd for 0.5 km (8 to 7 km north of Prince George). Until Sat Nov 15. Single lane alternating traffic. Last updated Tue Apr 15 at 3:44 PM PDT. (DBC-75426) |
Highway 97 Southbound |
Highway 97, southbound. Special event planned between Carp Lake Rd and Haight Rd for 6.0 km (McLeod Lake). Starting Wed Aug 6 at 9:00 AM PDT until Wed Aug 6 at 12:00 PM PDT. Lane Closure. Watch for traffic control personnel. Single lane alternating traffic will be in effect. Last updated Thu Apr 10 at 2:54 PM PDT. (DBC-75226) |
Highway 97 |
Highway 97. Utility work between Kennedy Rd and Powder King Rd for 30.2 km (25 km north of McLeod Lake to 4 km south of Pine Pass Summit). Until Fri May 30. Single lane alternating traffic. Watch for traffic control. Last updated Fri Apr 4 at 9:05 AM PDT. (DBC-74907) |
Highway 97 Southbound |
Highway 97, southbound. Bridge construction between Old Hasler Rd and Powder King Rd for 1.9 km (50 to 48 km south of Chetwynd). Until Mon Jun 30. Expect minor delays. Watch for crews and equipment working along the side of the road. Last updated Wed Mar 12 at 2:49 PM MST. (DBC-73850) |
Highway 97 Southbound |
Highway 97, southbound. Shoulder maintenance between Hasler Rd and Kloss Rd for 122.9 km (16 km north of McLeod Lake to 23 km south of Chetwynd). From 6:30 AM to 4:30 PM MST on Tuesday, Wednesday and Thursday. Shoulder grading. Watch for slow moving vehicles in the area. Last updated Mon Apr 14 at 2:23 PM MST. (DBC-75368) |
Highway 97 Southbound |
Highway 97, southbound. Road sweeping between Weiland Rd and Wildmare Subdiv for 6.7 km (Chetwynd). From 6:00 AM to 4:30 PM MST on Tuesday, Wednesday and Thursday. Road and barrier sweeping. Watch for slow moving vehicles in the area. Last updated Mon Apr 14 at 2:19 PM MST. (DBC-75366) |
Highway 97 Southbound |
Highway 97, southbound. Road sweeping between Watkins Rd and 52nd St NW for 33.7 km (Chetwynd). From 6:00 AM to 4:30 PM MST on Tuesday, Wednesday and Thursday. Road and barrier sweeping. Watch for slow moving vehicles in the area. Last updated Mon Apr 14 at 2:15 PM MST. (DBC-75365) |
Highway 97 Both Directions |
Highway 97 (Alaska Highway), in both directions. Bridge maintenance planned between Big Bam Rd and McMahon Dr for 1.0 km (Taylor). Starting Mon May 5 at 9:00 AM MST for the next two weeks. From 9:00 AM to 3:00 PM MST on weekdays. Width limit 3.85 m. 20 minute delays. Single lane alternating traffic, and pilot car traffic in effect. Midday break: 12pm-1pm. Loads exceeding 3.85M, wait until 3pm. Questions: 250-262-2600. Last updated Wed Apr 16 at 12:57 AM MST. (DBC-75427) |
Highway 97A Both Directions |
Highway 97A, in both directions. Watch for falling rocks between Swansea Point Rd and the end of Highway 97A for 9.4 km (Sicamous). There is debris on the road. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-73568) |
Highway 97C |
Highway 97C. Road sweeping between Highland Valley Copper Mine and Mesa Vista Dr for 41.6 km (Ashcroft). Watch for crews,sweeper and slow moving vehicles working. Last updated Mon Apr 7 at 6:08 PM PDT. (DBC-74988) |
Highway 97C |
Highway 97C. Utility work between Railway Ave and Brink St for 0.1 km (Ashcroft). Until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Shoulder closed. Expect delays of up to 5 minutes. No work taking place on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:07 AM PDT. (DBC-74586) |
Highway 97C |
Highway 97C. Utility work between Brink St and Government St for 0.3 km (Ashcroft). Until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:12 AM PDT. (DBC-74588) |
Highway 97C |
Highway 97C. Utility work between Government St and Empter Frontage Rd for 5.9 km (Ashcroft). Until Wed Apr 30. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays of up to 5 minutes. No work on long weekend. Please watch for signage and personnel. Last updated Fri Mar 28 at 10:31 AM PDT. (DBC-74590) |
Highway 99 Southbound |
Highway 99, southbound. Ditching between 72 St and Exit 20 for 0.3 km (Delta). Until Fri May 2. From 6:30 AM to 3:00 PM PDT on weekdays. Exit ramp is closed. Detour in effect. Exit 23: 80 St will be closed. Detour available via Exit 20. Last updated Sun Mar 30 at 8:40 AM PDT. (DBC-74159) |
Highway 99 Both Directions |
Highway 99, in both directions. Special event planned between W Pender St and Lions Gate Bridge for 3.3 km (West Vancouver to Vancouver). Starting Sun Apr 27 at 7:00 AM PDT until Sun Apr 27 at 11:30 AM PDT. Expect delays due to congestion. Lane Closure. VancouverSunRun.Com for additional information. Last updated Mon Mar 17 at 10:21 AM PDT. (DBC-74046) |
Highway 99 Northbound |
Highway 99, northbound. Electrical maintenance between Scott Cres and Cleveland Ave (Squamish). Until Fri May 2. Right turn lane closed. Shoulder closed. Next update time Fri May 2 at 6:00 AM PDT. Last updated Fri Mar 28 at 1:34 PM PDT. (DBC-74602) |
Highway 99 Northbound |
Highway 99, northbound. Construction work planned between Scott Cres and Cleveland Ave (Squamish). Starting Fri May 2 until Fri May 16 at 5:30 PM PDT. From 7:30 AM to 5:30 PM PDT on weekdays. Right turn lane will be closed. Shoulder will be closed. Work to end by 12 PM on Fridays. Pedestrian detour available. Last updated Fri Mar 28 at 1:39 PM PDT. (DBC-74601) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping planned between Exit 3: Horseshoe Bay Junction and Spring Creek Dr for 94.3 km (Whistler to West Vancouver). Starting Tue Apr 22 until Fri Apr 25. From 7:30 AM to 5:30 PM PDT daily. Shoulder will be closed. Watch for slow moving vehicles. Last updated Thu Apr 17 at 1:24 PM PDT. (DBC-75525) |
Highway 99 Both Directions |
Highway 99, in both directions. Construction work between Park St and Portage Rd for 0.5 km (Pemberton). Until Sat Aug 30. From 7:30 AM to 4:30 PM PST daily. Right turn lane off Hwy 99 and left turn lane onto Hwy 99 from existing access road are affected. Construction access and heavy truck access. Last updated Tue Mar 4 at 10:48 AM PST. (DBC-73529) |
Highway 99 Both Directions |
Highway 99, in both directions. Rock slope stabilization planned between Lil'wat Pl and Seton Lake Rd for 0.6 km (15 km south of Lillooet). Starting Thu Apr 24 at 7:00 AM PDT until Sat Jun 21 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. The work is 1 KM north of the Cottonwood Rec Site. Rock scaling and slope mesh installation. Last updated Thu Apr 17 at 3:13 PM PDT. (DBC-75530) |
Highway 99 Both Directions |
Highway 99, in both directions. Road sweeping between Seton Lake Rd and Pavilion-Clinton Rd for 34.4 km (Lillooet). Until Fri May 2 at 3:00 PM PDT. From 7:30 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Watch for slow moving vehicles and sweeper working. Last updated Mon Apr 7 at 6:14 PM PDT. (DBC-75027) |
Highway 99 |
Highway 99. Utility work between Sallus Creek Rd and Pavilion-Clinton Rd for 10.8 km (29 to 18 km north of Lillooet). Until Thu Apr 24. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Wed Apr 9 at 8:25 AM PDT. (DBC-75107) |
Morris Valley Rd Both Directions |
Morris Valley Rd, in both directions. Construction work at Chehalis Rd. Until Thu Apr 24. From 6:00 AM to 7:00 PM PDT daily. Intermittent single lane alternating traffic. Lane shift and speed reduction 24/7. Last updated Mon Mar 17 at 1:40 PM PDT. (DBC-73186) |
Other Roads |
Old Alaska Highway. Geotechnical investigation at Kiskatinaw Curved Bridge 30 km north of Dawson Creek. Bridge closed. Slide impacting bridge structure, assessment underway. Next update time Wed Jul 2 at 10:00 AM MST. Last updated Thu Jan 2 at 11:37 AM MST. (DBC-30093) |
Other Roads Both Directions |
Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Jun 30 at 10:00 AM PDT. Last updated Tue Apr 1 at 8:55 AM PDT. (DBC-35978) |
Other Roads Both Directions |
Fulford Ganges Road, in both directions. Road construction work between Seaview Avenue and Cranberry Road. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. No work on long weekends. No work April 18th to April 20th. Next update time Mon Jun 30 at 9:00 AM PDT. Last updated Sat Mar 29 at 9:29 AM PDT. (DBC-68621) |
Other Roads Both Directions |
Colleymount Rd, in both directions. Washout at 53.5km near Burns Lake. Single lane alternating traffic. Expect delays. Partial road washout, obey signage. Next update time Mon May 19 at 8:00 AM PDT. Last updated Thu Apr 17 at 7:56 AM PDT. (DBC-71008) |
Other Roads Both Directions |
Ravine Way, in both directions. Construction work between Highway 1 and Highway 17 near Victoria. Night Work from 8:00pm to 5:30am, Construction work between Highway 1 and Highway 17 near Victoria. Expect delays and traffic interruptions on Hwy 1, Hwy 17, Ravine Way and Carey Rd both directions. Construction zone in effect 24/7. Last updated Fri Mar 21 at 1:10 PM PDT. (DBC-71339) |
Other Roads Eastbound |
Dollarton Highway, eastbound. Utility work between Highway 1 and Dollarton Bridge in North Vancouver - City. Until Wed Apr 30. From 7:00 AM to 8:00 PM PDT daily. Shoulder closed. Watch for traffic control. Last updated Wed Mar 12 at 1:42 PM PDT. (DBC-72344) |
Other Roads Both Directions |
Fairbanks Rd, in both directions. Utility work between 1110 Fairbanks Rd and 1108 Fairbanks Rd. Until Sat May 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Utility Work - Pipe installation. Watch for work crews. Last updated Tue Apr 15 at 4:20 PM PDT. (DBC-73197) |
Other Roads Both Directions |
Kitsuksis Rd., in both directions. Utility work between Short st. And Spruce St. Until Fri Oct 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minor delays. Watch for traffic control. WATERMAIN INSTALL - Watch for work crews. Last updated Tue Mar 18 at 11:57 AM PDT. (DBC-73760) |
Other Roads Both Directions |
Othello Road, in both directions. Construction work between Tunnels Road and Highway 5 (Exit 183). Until Fri May 2. From 6:00 AM to 7:00 PM PDT daily. Expect delays. Othello Road MoTT Project. Last updated Thu Mar 20 at 3:18 PM PDT. (DBC-74227) |
Other Roads Eastbound |
Long Harbour Rd, eastbound. Utility work planned between Welbury Dr and Ferry Terminal in Salt Spring Island. Starting Tue Apr 22 until Fri May 16. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Tue Apr 1 at 12:36 PM PDT. (DBC-74731) |
Other Roads Both Directions |
56th Ave, in both directions. Night time construction work between 256th St and Gloucester Way. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:11 PM PDT. (DBC-74742) |
Other Roads Both Directions |
264th Street, in both directions. Night time construction work between 48 Ave and 58 Ave. Until Sat May 31 at 5:30 AM PDT. From 9:00 PM to 5:30 AM PDT daily. Geotechnical investigation. Lane Closure. Watch for traffic control. Last updated Tue Apr 1 at 4:22 PM PDT. (DBC-74747) |
Other Roads Both Directions |
Eakin Creek Rd, in both directions. There are rocks on the road between Highway 24 and Eakin Creek Canyon Provincial Park. Road closed. Assessment in progress. Next update time Wed Apr 23 at 3:00 PM PDT. Last updated Thu Apr 17 at 1:18 PM PDT. (DBC-74750) |
Other Roads Eastbound |
Mountain Hwy, eastbound. Utility work planned between Highway 1 and Arborlynn Dr. Starting Tue Apr 29 at 9:00 AM PDT until Tue Apr 29 at 3:00 PM PDT. Last updated Thu Apr 3 at 5:44 PM PDT. (DBC-74892) |
Other Roads Both Directions |
Mission Mountain Road, in both directions. Muddy sections between Mission Dam and Shalalth Cut Off near Lillooet. Last updated Sat Apr 19 at 11:09 AM PDT. (DBC-74943) |
Other Roads Both Directions |
Riverside Rd, in both directions. Roadway obstruction between 233 Riverside Rd and 136 Riverside Rd. Road closed. Sinkhole blocking both lanes. All properties are accessible on either side of the closure. Next update time Thu Apr 24 at 10:00 AM PDT. Last updated Sat Apr 19 at 11:10 AM PDT. (DBC-75092) |
Other Roads |
Hardy Bay Rd. Special event planned between Market St and Coal Harbour Rd 1 km north of Port Hardy. Starting Sun Jun 1 at 7:00 AM PDT until Sun Jun 1 at 2:00 PM PDT. Hardy Hussle June 1 7am to 2pm. Last updated Tue Apr 8 at 3:23 PM PDT. (DBC-75103) |
Other Roads |
Canal Road . Bridge maintenance between Wallace Road and Ainslei Point road. From 7:00 AM to 5:00 PM PDT daily. Expect minor delays. Last updated Thu Apr 10 at 12:11 PM PDT. (DBC-75212) |
Other Roads Westbound |
NW Marine Drive, westbound. Maintenance planned between 4900 Block and Spanish Banks West Parking Lot A in Vancouver. Starting Mon Apr 28 until Fri May 2. From 7:00 AM to 3:00 PM PDT on weekdays. Watch for traffic control personnel. Last updated Thu Apr 10 at 5:07 PM PDT. (DBC-75235) |
Other Roads Both Directions |
Fisher Rd, in both directions. Special event planned between Holland Ave and Watson Ave. Starting Sat Aug 23 at 7:00 AM PDT until Sat Aug 23 at 5:00 PM PDT. Road closure planned. Cobble Hill Fair. Last updated Mon Apr 14 at 9:51 AM PDT. (DBC-75349) |
Other Roads |
Indian Rock Rd. Bridge maintenance planned between Somerset Ln and 6775 Indian Rock Rd. Starting Mon Apr 28 until Wed Apr 30. From 6:00 AM to 8:00 PM PDT on Monday, Tuesday and Wednesday. Paving operations planned. Apr 28 single lane alternating: 6AM-6PM. 6 PM-6AM: bridge open.
Apr 29 closed 6AM-8PM. 8PM-6AM: bridge open.
Apr 30 single lane alternating: 6am-6pm. Estimated time of re-opening Wed Apr 16 at 6:00 PM PDT. Last updated Mon Apr 14 at 10:33 PM PDT. (DBC-75360) |
Other Roads Both Directions |
Jingle Pot rd, in both directions. Special event planned between Doumont Rd. And Maxey Rd. Starting Sun May 11 at 7:30 AM PDT until Sun May 11 at 11:00 AM PDT. SPECIAL EVENT - WESTWOOD LAKE TRIATHALON. Watch for cyclists on shoulder. Last updated Wed Apr 16 at 3:46 PM PDT. (DBC-75477) |
Other Roads |
Highway 16 (Yellowhead). Utility work at Andesite Creek near Terrace. Until Tue Apr 22. From 6:00 AM to 8:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Intermittent single lane alternating traffic. Last updated Thu Apr 17 at 3:39 PM PDT. (DBC-75534) |
Telegraph Creek Rd |
Telegraph Creek Rd (Highway 51). Muddy sections between Stikine Ave and Boulder Ave for 111.1 km (Telegraph Creek to Dease Lake). Last updated Sat Apr 19 at 6:52 AM PDT. (DBCRCON-221877) |
Telegraph Creek Rd |
Telegraph Creek Rd (Highway 51). Rest area closed at Burnt Trailer/Tanzilla Acc (51 km west of Dease Lake). E Hok E Edak An (The Burn) Rest Area closed for repairs. Next update time Mon Apr 28 at 3:00 PM PDT. Last updated Mon Apr 14 at 2:42 PM PDT. (DBC-73948) |
Upper Arrow Lake Ferry |
Upper Arrow Lake Ferry. Departure delayed between Shelter Bay and Galena Bay. From 8:45 AM to 11:00 AM PST on Wednesday. Departure delayed every Wednesday for fueling purposes. Next update time Wed Dec 31 at 10:00 AM PST. Last updated Tue Jan 7 at 12:16 PM PST. (DBC-71712) |
Usk Ferry |
Usk Ferry. Seasonal shutdown between Usk Ferry and the end of Usk Ferry (Usk). Cable Car in service. Last updated Mon Dec 16 at 9:15 AM PST. (DBC-71149) |