-
Lower Mainland / Highway 7 Both Directions
-
Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Watch for traffic control. Work days April 22-26, April 28-May 3. WB right turn to 272nd closed. Detour at 263rd. Construction speed limit 50km/hr. River Rd single lane alternating as needed. Next update time Sat Apr 26 at 6:00 PM PDT. Last updated Thu Apr 17 at 6:06 PM PDT. (DBC-70968)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Today Tonight Abbotsford 15 7 Pitt Meadows 13 7 White Rock 13 7 Chilliwack 15 7 Vancouver 13 7 Agassiz 15 7 Source: Environment Canada