• Lower Mainland / Highway 7 Both Directions
  • Highway 7 (Lougheed Highway), in both directions. Road construction work between 266 St and 287 St for 3.9 km (Maple Ridge). From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. July 21-26, 27-August 1. No work August 2-4. Construction speed limit 50km/h. Expect delays. Next update time Mon Aug 4 at 3:00 PM PDT. Last updated Mon Jul 21 at 11:25 AM PDT. (DBC-70968)

  • Nearby Highway Webcams
  • Silverdale - S
    Silverdale - S
    Highway 7 (Lougheed Highway) at Hayward Street in Mission, looking south to Hayward Street.
    Silverdale - W
    Silverdale - W
    Highway 7 (Lougheed Highway) at Hayward Street in Mission, looking westbound along Highway 7.
    Silverdale - N
    Silverdale - N
    Highway 7 (Lougheed Highway) at Hayward Street in Mission, looking north along Hayward Street.
  • Nearby Weather Station Reports
  • Forecast Tonight Thu
    Abbotsford
    16 26
    Pitt Meadows
    17 23
    White Rock
    17 23
    Chilliwack
    16 26
    Vancouver
    17 23
    Agassiz
    16 26
    Source: Environment Canada