-
Lower Mainland / Highway 11
-
Highway 11. Bridge construction between Riverside St and Cedar Valley Conn for 3.2 km (Mission to Abbotsford). Until Fri May 9. From 9:00 PM to 6:30 AM PDT on Saturday and from 9:00 PM to 5:30 AM PDT on weekdays and Sunday. Lane Closure. NB work until May 3: 1 lane closed. Width restriction 3.8m. Loads over 3.8m may not cross until 4:30AM, supervised with 7 days notice. Speed bumps 24hrs/day. Last updated Sat Apr 12 at 1:47 AM PDT. (DBC-74538)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Today Tonight Abbotsford 15 7 Chilliwack 15 7 Pitt Meadows 13 7 White Rock 13 7 Agassiz 15 7 Vancouver 13 7 Source: Environment Canada