-
Lower Mainland / Highway 9 Both Directions
-
Highway 9, in both directions. Road construction work between Emerald Ave and Miami River Dr for 1.4 km (Harrison Hot Springs). Until Fri Nov 14. From 8:00 AM to 9:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed zone. Watch for traffic control equipment and personnel. Last updated Tue Sep 9 at 7:11 PM PDT. (DBC-81376)
-
Nearby Highway Webcams
-
Nearby Weather Station Reports
-
Forecast Tonight Fri Agassiz 13 22 Chilliwack 13 22 Hope 16 23 Hope Slide 12 24 Abbotsford 13 22 Coquihalla Highway - Hope to Merritt - - Source: Environment Canada