• Lower Mainland / Highway 9 Both Directions
  • Highway 9, in both directions. Road construction work between Emerald Ave and Miami River Dr for 1.4 km (Harrison Hot Springs). Until Fri Nov 14. From 8:00 AM to 9:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed zone. Watch for traffic control equipment and personnel. Last updated Tue Sep 9 at 7:11 PM PDT. (DBC-81376)

  • Nearby Highway Webcams
  • Agassiz
    Agassiz
    Highway 7 at Highway 9 (Evergreen Drive) in Agassiz, looking east.
    Herrling Island Overpass - N
    Herrling Island Overpass - N
    Highway 1 at Herrling Island overpass, looking north.
    Herrling Island - W
    Herrling Island - W
    Highway 1 near Herrling Island, looking west.
  • Nearby Weather Station Reports
  • Forecast Tonight Fri
    Agassiz
    13 22
    Chilliwack
    13 22
    Hope
    16 23
    Hope Slide
    12 24
    Abbotsford
    13 22
    Coquihalla Highway - Hope to Merritt
    - -
    Source: Environment Canada